Routing info

Name: Auto 2025-12-06

Routing metric: Travel time

1005 Trucks in Route

Restrictions

No Restrictions Applied.

Truck Station

Station Name: TS 1

Address: Filonos 2-8, Keratsini 187 57

Path info

Path ID: 194860

Truck: Truck auto 44 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 43 - Driver
  • Worker 84 - Worker
  • Worker 85 - Worker

Load: 15.6 m³

Duration: 00:15:26

Travel Duration: 00:05:26

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:03

Slack: 22:13:56

Path info

Path ID: 194861

Truck: Truck auto 110 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 109 - Driver
  • Worker 216 - Worker
  • Worker 217 - Worker

Load: 15.7 m³

Duration: 00:14:49

Travel Duration: 00:03:49

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:26

Slack: 22:14:33

Path info

Path ID: 194862

Truck: Truck auto 182 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 181 - Driver
  • Worker 360 - Worker
  • Worker 361 - Worker

Load: 15.72 m³

Duration: 00:13:46

Travel Duration: 00:04:46

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:23

Slack: 22:15:36

Path info

Path ID: 194863

Truck: Truck auto 246 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 245 - Driver
  • Worker 488 - Worker
  • Worker 489 - Worker

Load: 15.43 m³

Duration: 00:14:52

Travel Duration: 00:03:52

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:29

Slack: 22:14:30

Path info

Path ID: 194864

Truck: Truck auto 284 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 283 - Driver
  • Worker 564 - Worker
  • Worker 565 - Worker

Load: 14.91 m³

Duration: 00:15:08

Travel Duration: 00:05:08

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:45

Slack: 22:14:14

Path info

Path ID: 194865

Truck: Truck auto 330 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 329 - Driver
  • Worker 656 - Worker
  • Worker 657 - Worker

Load: 15.58 m³

Duration: 00:14:04

Travel Duration: 00:06:04

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:41

Slack: 22:15:18

Path info

Path ID: 194866

Truck: Truck auto 400 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 399 - Driver
  • Worker 796 - Worker
  • Worker 797 - Worker

Load: 15.6 m³

Duration: 00:16:02

Travel Duration: 00:06:02

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:39

Slack: 22:13:20

Path info

Path ID: 194867

Truck: Truck auto 406 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 405 - Driver
  • Worker 808 - Worker
  • Worker 809 - Worker

Load: 15.57 m³

Duration: 00:12:40

Travel Duration: 00:02:40

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:17

Slack: 22:16:42

Path info

Path ID: 194868

Truck: Truck auto 484 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 483 - Driver
  • Worker 964 - Worker
  • Worker 965 - Worker

Load: 15.89 m³

Duration: 00:17:55

Travel Duration: 00:06:55

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:32

Slack: 22:11:27

Path info

Path ID: 194869

Truck: Truck auto 490 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 489 - Driver
  • Worker 976 - Worker
  • Worker 977 - Worker

Load: 16.0 m³

Duration: 00:17:01

Travel Duration: 00:07:01

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:38

Slack: 22:12:21

Path info

Path ID: 194870

Truck: Truck auto 584 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 583 - Driver
  • Worker 1164 - Worker
  • Worker 1165 - Worker

Load: 15.38 m³

Duration: 00:13:42

Travel Duration: 00:03:42

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:19

Slack: 22:15:40

Path info

Path ID: 194871

Truck: Truck auto 660 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 659 - Driver
  • Worker 1316 - Worker
  • Worker 1317 - Worker

Load: 15.93 m³

Duration: 00:14:56

Travel Duration: 00:04:56

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:33

Slack: 22:14:26

Path info

Path ID: 194872

Truck: Truck auto 710 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 709 - Driver
  • Worker 1416 - Worker
  • Worker 1417 - Worker

Load: 14.62 m³

Duration: 00:13:11

Travel Duration: 00:04:11

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:48

Slack: 22:16:11

Path info

Path ID: 194873

Truck: Truck auto 720 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 719 - Driver
  • Worker 1436 - Worker
  • Worker 1437 - Worker

Load: 15.87 m³

Duration: 00:15:11

Travel Duration: 00:05:11

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:48

Slack: 22:14:11

Path info

Path ID: 194874

Truck: Truck auto 748 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 747 - Driver
  • Worker 1492 - Worker
  • Worker 1493 - Worker

Load: 15.8 m³

Duration: 00:18:15

Travel Duration: 00:07:15

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:52

Slack: 22:11:07

Path info

Path ID: 194875

Truck: Truck auto 766 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 765 - Driver
  • Worker 1528 - Worker
  • Worker 1529 - Worker

Load: 15.95 m³

Duration: 00:18:00

Travel Duration: 00:07:00

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:37

Slack: 22:11:22

Path info

Path ID: 194876

Truck: Truck auto 860 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 859 - Driver
  • Worker 1716 - Worker
  • Worker 1717 - Worker

Load: 15.18 m³

Duration: 00:16:26

Travel Duration: 00:04:26

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:03

Slack: 22:12:56

Path info

Path ID: 194877

Truck: Truck auto 908 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 907 - Driver
  • Worker 1812 - Worker
  • Worker 1813 - Worker

Load: 15.78 m³

Duration: 00:16:55

Travel Duration: 00:05:55

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:32

Slack: 22:12:27

Path info

Path ID: 194878

Truck: Truck auto 988 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 987 - Driver
  • Worker 1972 - Worker
  • Worker 1973 - Worker

Load: 15.92 m³

Duration: 00:14:07

Travel Duration: 00:05:07

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:44

Slack: 22:15:15

Path info

Path ID: 194879

Truck: Truck auto 45 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 44 - Driver
  • Worker 86 - Worker
  • Worker 87 - Worker

Load: 15.69 m³

Duration: 00:17:18

Travel Duration: 00:05:18

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:55

Slack: 22:12:04

Path info

Path ID: 194880

Truck: Truck auto 77 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 76 - Driver
  • Worker 150 - Worker
  • Worker 151 - Worker

Load: 15.97 m³

Duration: 00:14:38

Travel Duration: 00:04:38

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:15

Slack: 22:14:44

Path info

Path ID: 194881

Truck: Truck auto 123 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 122 - Driver
  • Worker 242 - Worker
  • Worker 243 - Worker

Load: 9.28 m³

Duration: 00:11:09

Travel Duration: 00:04:09

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:46

Slack: 22:18:13

Path info

Path ID: 194882

Truck: Truck auto 185 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 184 - Driver
  • Worker 366 - Worker
  • Worker 367 - Worker

Load: 15.71 m³

Duration: 00:14:14

Travel Duration: 00:04:14

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:51

Slack: 22:15:08

Path info

Path ID: 194883

Truck: Truck auto 199 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 198 - Driver
  • Worker 394 - Worker
  • Worker 395 - Worker

Load: 15.41 m³

Duration: 00:13:08

Travel Duration: 00:04:08

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:45

Slack: 22:16:14

Path info

Path ID: 194884

Truck: Truck auto 217 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 216 - Driver
  • Worker 430 - Worker
  • Worker 431 - Worker

Load: 15.97 m³

Duration: 00:16:49

Travel Duration: 00:06:49

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:26

Slack: 22:12:33

Path info

Path ID: 194885

Truck: Truck auto 227 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 226 - Driver
  • Worker 450 - Worker
  • Worker 451 - Worker

Load: 15.8 m³

Duration: 00:16:01

Travel Duration: 00:07:01

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:38

Slack: 22:13:21

Path info

Path ID: 194886

Truck: Truck auto 235 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 234 - Driver
  • Worker 466 - Worker
  • Worker 467 - Worker

Load: 15.93 m³

Duration: 00:19:05

Travel Duration: 00:07:05

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:42

Slack: 22:10:17

Path info

Path ID: 194887

Truck: Truck auto 267 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 266 - Driver
  • Worker 530 - Worker
  • Worker 531 - Worker

Load: 15.58 m³

Duration: 00:12:51

Travel Duration: 00:02:51

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:28

Slack: 22:16:31

Path info

Path ID: 194888

Truck: Truck auto 279 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 278 - Driver
  • Worker 554 - Worker
  • Worker 555 - Worker

Load: 15.5 m³

Duration: 00:15:03

Travel Duration: 00:06:03

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:40

Slack: 22:14:19

Path info

Path ID: 194889

Truck: Truck auto 295 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 294 - Driver
  • Worker 586 - Worker
  • Worker 587 - Worker

Load: 15.71 m³

Duration: 00:12:56

Travel Duration: 00:03:56

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:33

Slack: 22:16:26

Path info

Path ID: 194890

Truck: Truck auto 303 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 302 - Driver
  • Worker 602 - Worker
  • Worker 603 - Worker

Load: 14.07 m³

Duration: 00:16:57

Travel Duration: 00:06:57

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:34

Slack: 22:12:25

Path info

Path ID: 194891

Truck: Truck auto 307 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 306 - Driver
  • Worker 610 - Worker
  • Worker 611 - Worker

Load: 15.7 m³

Duration: 00:16:00

Travel Duration: 00:06:00

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:37

Slack: 22:13:22

Path info

Path ID: 194892

Truck: Truck auto 309 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 308 - Driver
  • Worker 614 - Worker
  • Worker 615 - Worker

Load: 14.96 m³

Duration: 00:15:33

Travel Duration: 00:05:33

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:10

Slack: 22:13:49

Path info

Path ID: 194893

Truck: Truck auto 369 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 368 - Driver
  • Worker 734 - Worker
  • Worker 735 - Worker

Load: 15.75 m³

Duration: 00:14:38

Travel Duration: 00:05:38

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:15

Slack: 22:14:44

Path info

Path ID: 194894

Truck: Truck auto 375 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 374 - Driver
  • Worker 746 - Worker
  • Worker 747 - Worker

Load: 15.86 m³

Duration: 00:12:27

Travel Duration: 00:03:27

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:04

Slack: 22:16:55

Path info

Path ID: 194895

Truck: Truck auto 419 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 418 - Driver
  • Worker 834 - Worker
  • Worker 835 - Worker

Load: 15.67 m³

Duration: 00:15:08

Travel Duration: 00:06:08

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:45

Slack: 22:14:14

Path info

Path ID: 194896

Truck: Truck auto 501 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 500 - Driver
  • Worker 998 - Worker
  • Worker 999 - Worker

Load: 9.95 m³

Duration: 00:09:14

Travel Duration: 00:03:14

Wait Duration: 00:00:00

Service Duration: 00:06:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:39:51

Slack: 22:20:08

Path info

Path ID: 194897

Truck: Truck auto 513 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 512 - Driver
  • Worker 1022 - Worker
  • Worker 1023 - Worker

Load: 15.6 m³

Duration: 00:15:10

Travel Duration: 00:04:10

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:47

Slack: 22:14:12

Path info

Path ID: 194898

Truck: Truck auto 519 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 518 - Driver
  • Worker 1034 - Worker
  • Worker 1035 - Worker

Load: 15.89 m³

Duration: 00:13:57

Travel Duration: 00:03:57

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:34

Slack: 22:15:25

Path info

Path ID: 194899

Truck: Truck auto 585 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 584 - Driver
  • Worker 1166 - Worker
  • Worker 1167 - Worker

Load: 15.13 m³

Duration: 00:13:15

Travel Duration: 00:03:15

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:52

Slack: 22:16:07

Path info

Path ID: 194900

Truck: Truck auto 587 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 586 - Driver
  • Worker 1170 - Worker
  • Worker 1171 - Worker

Load: 15.63 m³

Duration: 00:16:23

Travel Duration: 00:05:23

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:00

Slack: 22:12:59

Path info

Path ID: 194901

Truck: Truck auto 623 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 622 - Driver
  • Worker 1242 - Worker
  • Worker 1243 - Worker

Load: 15.96 m³

Duration: 00:11:46

Travel Duration: 00:02:46

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:23

Slack: 22:17:36

Path info

Path ID: 194902

Truck: Truck auto 631 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 630 - Driver
  • Worker 1258 - Worker
  • Worker 1259 - Worker

Load: 15.89 m³

Duration: 00:12:33

Travel Duration: 00:03:33

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:10

Slack: 22:16:49

Path info

Path ID: 194903

Truck: Truck auto 657 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 656 - Driver
  • Worker 1310 - Worker
  • Worker 1311 - Worker

Load: 15.48 m³

Duration: 00:14:56

Travel Duration: 00:03:56

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:33

Slack: 22:14:26

Path info

Path ID: 194904

Truck: Truck auto 701 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 700 - Driver
  • Worker 1398 - Worker
  • Worker 1399 - Worker

Load: 15.95 m³

Duration: 00:15:17

Travel Duration: 00:05:17

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:54

Slack: 22:14:05

Path info

Path ID: 194905

Truck: Truck auto 759 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 758 - Driver
  • Worker 1514 - Worker
  • Worker 1515 - Worker

Load: 15.87 m³

Duration: 00:17:45

Travel Duration: 00:05:45

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:22

Slack: 22:11:37

Path info

Path ID: 194906

Truck: Truck auto 867 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 866 - Driver
  • Worker 1730 - Worker
  • Worker 1731 - Worker

Load: 15.61 m³

Duration: 00:15:07

Travel Duration: 00:05:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:44

Slack: 22:14:15

Path info

Path ID: 194907

Truck: Truck auto 945 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 944 - Driver
  • Worker 1886 - Worker
  • Worker 1887 - Worker

Load: 15.77 m³

Duration: 00:16:07

Travel Duration: 00:05:07

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:44

Slack: 22:13:15

Path info

Path ID: 194908

Truck: Truck auto 985 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 984 - Driver
  • Worker 1966 - Worker
  • Worker 1967 - Worker

Load: 15.6 m³

Duration: 00:15:48

Travel Duration: 00:04:48

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:25

Slack: 22:13:34

Path info

Path ID: 194909

Truck: Truck auto 48 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 47 - Driver
  • Worker 92 - Worker
  • Worker 93 - Worker

Load: 15.28 m³

Duration: 00:11:52

Travel Duration: 00:03:52

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:29

Slack: 22:17:30

Path info

Path ID: 194910

Truck: Truck auto 58 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 57 - Driver
  • Worker 112 - Worker
  • Worker 113 - Worker

Load: 15.7 m³

Duration: 00:16:25

Travel Duration: 00:06:25

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:02

Slack: 22:12:57

Path info

Path ID: 194911

Truck: Truck auto 142 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 141 - Driver
  • Worker 280 - Worker
  • Worker 281 - Worker

Load: 13.44 m³

Duration: 00:12:07

Travel Duration: 00:03:07

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:44

Slack: 22:17:15

Path info

Path ID: 194912

Truck: Truck auto 162 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 161 - Driver
  • Worker 320 - Worker
  • Worker 321 - Worker

Load: 15.66 m³

Duration: 00:13:46

Travel Duration: 00:03:46

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:23

Slack: 22:15:36

Path info

Path ID: 194913

Truck: Truck auto 166 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 165 - Driver
  • Worker 328 - Worker
  • Worker 329 - Worker

Load: 15.72 m³

Duration: 00:14:28

Travel Duration: 00:04:28

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:05

Slack: 22:14:54

Path info

Path ID: 194914

Truck: Truck auto 174 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 173 - Driver
  • Worker 344 - Worker
  • Worker 345 - Worker

Load: 15.94 m³

Duration: 00:18:06

Travel Duration: 00:07:06

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:43

Slack: 22:11:16

Path info

Path ID: 194915

Truck: Truck auto 186 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 185 - Driver
  • Worker 368 - Worker
  • Worker 369 - Worker

Load: 15.86 m³

Duration: 00:14:21

Travel Duration: 00:04:21

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:58

Slack: 22:15:01

Path info

Path ID: 194916

Truck: Truck auto 210 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 209 - Driver
  • Worker 416 - Worker
  • Worker 417 - Worker

Load: 15.75 m³

Duration: 00:16:27

Travel Duration: 00:06:27

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:04

Slack: 22:12:55

Path info

Path ID: 194917

Truck: Truck auto 226 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 225 - Driver
  • Worker 448 - Worker
  • Worker 449 - Worker

Load: 15.6 m³

Duration: 00:15:50

Travel Duration: 00:05:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:27

Slack: 22:13:32

Path info

Path ID: 194918

Truck: Truck auto 260 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 259 - Driver
  • Worker 516 - Worker
  • Worker 517 - Worker

Load: 15.96 m³

Duration: 00:15:19

Travel Duration: 00:05:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:56

Slack: 22:14:03

Path info

Path ID: 194919

Truck: Truck auto 264 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 263 - Driver
  • Worker 524 - Worker
  • Worker 525 - Worker

Load: 15.4 m³

Duration: 00:16:34

Travel Duration: 00:05:34

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:11

Slack: 22:12:48

Path info

Path ID: 194920

Truck: Truck auto 342 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 341 - Driver
  • Worker 680 - Worker
  • Worker 681 - Worker

Load: 15.92 m³

Duration: 00:16:16

Travel Duration: 00:06:16

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:53

Slack: 22:13:06

Path info

Path ID: 194921

Truck: Truck auto 390 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 389 - Driver
  • Worker 776 - Worker
  • Worker 777 - Worker

Load: 15.42 m³

Duration: 00:15:27

Travel Duration: 00:05:27

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:04

Slack: 22:13:55

Path info

Path ID: 194922

Truck: Truck auto 398 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 397 - Driver
  • Worker 792 - Worker
  • Worker 793 - Worker

Load: 16.0 m³

Duration: 00:16:56

Travel Duration: 00:06:56

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:33

Slack: 22:12:26

Path info

Path ID: 194923

Truck: Truck auto 406 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 405 - Driver
  • Worker 808 - Worker
  • Worker 809 - Worker

Load: 15.78 m³

Duration: 00:11:49

Travel Duration: 00:02:49

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:26

Slack: 22:17:33

Path info

Path ID: 194924

Truck: Truck auto 438 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 437 - Driver
  • Worker 872 - Worker
  • Worker 873 - Worker

Load: 15.93 m³

Duration: 00:14:12

Travel Duration: 00:05:12

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:49

Slack: 22:15:10

Path info

Path ID: 194925

Truck: Truck auto 458 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 457 - Driver
  • Worker 912 - Worker
  • Worker 913 - Worker

Load: 15.87 m³

Duration: 00:14:54

Travel Duration: 00:04:54

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:31

Slack: 22:14:28

Path info

Path ID: 194926

Truck: Truck auto 468 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 467 - Driver
  • Worker 932 - Worker
  • Worker 933 - Worker

Load: 15.69 m³

Duration: 00:13:00

Travel Duration: 00:04:00

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:37

Slack: 22:16:22

Path info

Path ID: 194927

Truck: Truck auto 500 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 499 - Driver
  • Worker 996 - Worker
  • Worker 997 - Worker

Load: 15.75 m³

Duration: 00:15:18

Travel Duration: 00:05:18

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:55

Slack: 22:14:04

Path info

Path ID: 194928

Truck: Truck auto 562 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 561 - Driver
  • Worker 1120 - Worker
  • Worker 1121 - Worker

Load: 15.96 m³

Duration: 00:14:38

Travel Duration: 00:03:38

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:15

Slack: 22:14:44

Path info

Path ID: 194929

Truck: Truck auto 572 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 571 - Driver
  • Worker 1140 - Worker
  • Worker 1141 - Worker

Load: 15.46 m³

Duration: 00:16:42

Travel Duration: 00:05:42

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:19

Slack: 22:12:40

Path info

Path ID: 194930

Truck: Truck auto 610 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 609 - Driver
  • Worker 1216 - Worker
  • Worker 1217 - Worker

Load: 15.83 m³

Duration: 00:15:34

Travel Duration: 00:05:34

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:11

Slack: 22:13:48

Path info

Path ID: 194931

Truck: Truck auto 642 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 641 - Driver
  • Worker 1280 - Worker
  • Worker 1281 - Worker

Load: 15.6 m³

Duration: 00:12:27

Travel Duration: 00:03:27

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:04

Slack: 22:16:55

Path info

Path ID: 194932

Truck: Truck auto 714 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 713 - Driver
  • Worker 1424 - Worker
  • Worker 1425 - Worker

Load: 15.95 m³

Duration: 00:13:26

Travel Duration: 00:04:26

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:03

Slack: 22:15:56

Path info

Path ID: 194933

Truck: Truck auto 738 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 737 - Driver
  • Worker 1472 - Worker
  • Worker 1473 - Worker

Load: 15.87 m³

Duration: 00:14:44

Travel Duration: 00:05:44

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:21

Slack: 22:14:38

Path info

Path ID: 194934

Truck: Truck auto 790 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 789 - Driver
  • Worker 1576 - Worker
  • Worker 1577 - Worker

Load: 15.41 m³

Duration: 00:13:17

Travel Duration: 00:04:17

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:54

Slack: 22:16:05

Path info

Path ID: 194935

Truck: Truck auto 866 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 865 - Driver
  • Worker 1728 - Worker
  • Worker 1729 - Worker

Load: 15.96 m³

Duration: 00:16:11

Travel Duration: 00:05:11

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:48

Slack: 22:13:11

Path info

Path ID: 194936

Truck: Truck auto 888 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 887 - Driver
  • Worker 1772 - Worker
  • Worker 1773 - Worker

Load: 15.25 m³

Duration: 00:13:23

Travel Duration: 00:05:23

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:00

Slack: 22:15:59

Path info

Path ID: 194937

Truck: Truck auto 978 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 977 - Driver
  • Worker 1952 - Worker
  • Worker 1953 - Worker

Load: 15.99 m³

Duration: 00:15:16

Travel Duration: 00:05:16

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:53

Slack: 22:14:06

Path info

Path ID: 194938

Truck: Truck auto 980 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 979 - Driver
  • Worker 1956 - Worker
  • Worker 1957 - Worker

Load: 15.36 m³

Duration: 00:14:54

Travel Duration: 00:04:54

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:31

Slack: 22:14:28

Path info

Path ID: 194939

Truck: Truck auto 25 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 24 - Driver
  • Worker 46 - Worker
  • Worker 47 - Worker

Load: 15.83 m³

Duration: 00:16:10

Travel Duration: 00:05:10

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:47

Slack: 22:13:12

Path info

Path ID: 194940

Truck: Truck auto 141 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 140 - Driver
  • Worker 278 - Worker
  • Worker 279 - Worker

Load: 15.9 m³

Duration: 00:15:01

Travel Duration: 00:05:01

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:38

Slack: 22:14:21

Path info

Path ID: 194941

Truck: Truck auto 173 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 172 - Driver
  • Worker 342 - Worker
  • Worker 343 - Worker

Load: 15.51 m³

Duration: 00:13:34

Travel Duration: 00:04:34

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:11

Slack: 22:15:48

Path info

Path ID: 194942

Truck: Truck auto 235 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 234 - Driver
  • Worker 466 - Worker
  • Worker 467 - Worker

Load: 14.18 m³

Duration: 00:12:50

Travel Duration: 00:03:50

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:27

Slack: 22:16:32

Path info

Path ID: 194943

Truck: Truck auto 265 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 264 - Driver
  • Worker 526 - Worker
  • Worker 527 - Worker

Load: 15.63 m³

Duration: 00:18:19

Travel Duration: 00:07:19

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:56

Slack: 22:11:03

Path info

Path ID: 194944

Truck: Truck auto 293 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 292 - Driver
  • Worker 582 - Worker
  • Worker 583 - Worker

Load: 15.93 m³

Duration: 00:13:23

Travel Duration: 00:04:23

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:00

Slack: 22:15:59

Path info

Path ID: 194945

Truck: Truck auto 313 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 312 - Driver
  • Worker 622 - Worker
  • Worker 623 - Worker

Load: 15.99 m³

Duration: 00:16:18

Travel Duration: 00:06:18

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:55

Slack: 22:13:04

Path info

Path ID: 194946

Truck: Truck auto 323 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 322 - Driver
  • Worker 642 - Worker
  • Worker 643 - Worker

Load: 15.48 m³

Duration: 00:13:14

Travel Duration: 00:05:14

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:51

Slack: 22:16:08

Path info

Path ID: 194947

Truck: Truck auto 337 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 336 - Driver
  • Worker 670 - Worker
  • Worker 671 - Worker

Load: 15.86 m³

Duration: 00:14:50

Travel Duration: 00:05:50

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:27

Slack: 22:14:32

Path info

Path ID: 194948

Truck: Truck auto 389 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 388 - Driver
  • Worker 774 - Worker
  • Worker 775 - Worker

Load: 15.69 m³

Duration: 00:14:15

Travel Duration: 00:04:15

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:52

Slack: 22:15:07

Path info

Path ID: 194949

Truck: Truck auto 395 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 394 - Driver
  • Worker 786 - Worker
  • Worker 787 - Worker

Load: 15.8 m³

Duration: 00:14:40

Travel Duration: 00:03:40

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:17

Slack: 22:14:42

Path info

Path ID: 194950

Truck: Truck auto 485 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 484 - Driver
  • Worker 966 - Worker
  • Worker 967 - Worker

Load: 15.05 m³

Duration: 00:14:46

Travel Duration: 00:06:46

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:23

Slack: 22:14:36

Path info

Path ID: 194951

Truck: Truck auto 505 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 504 - Driver
  • Worker 1006 - Worker
  • Worker 1007 - Worker

Load: 12.57 m³

Duration: 00:08:04

Travel Duration: 00:02:04

Wait Duration: 00:00:00

Service Duration: 00:06:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:38:41

Slack: 22:21:18

Path info

Path ID: 194952

Truck: Truck auto 613 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 612 - Driver
  • Worker 1222 - Worker
  • Worker 1223 - Worker

Load: 14.26 m³

Duration: 00:12:36

Travel Duration: 00:04:36

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:13

Slack: 22:16:46

Path info

Path ID: 194953

Truck: Truck auto 671 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 670 - Driver
  • Worker 1338 - Worker
  • Worker 1339 - Worker

Load: 15.88 m³

Duration: 00:16:58

Travel Duration: 00:06:58

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:35

Slack: 22:12:24

Path info

Path ID: 194954

Truck: Truck auto 687 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 686 - Driver
  • Worker 1370 - Worker
  • Worker 1371 - Worker

Load: 14.31 m³

Duration: 00:14:23

Travel Duration: 00:04:23

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:00

Slack: 22:14:59

Path info

Path ID: 194955

Truck: Truck auto 743 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 742 - Driver
  • Worker 1482 - Worker
  • Worker 1483 - Worker

Load: 15.03 m³

Duration: 00:16:04

Travel Duration: 00:06:04

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:41

Slack: 22:13:18

Path info

Path ID: 194956

Truck: Truck auto 749 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 748 - Driver
  • Worker 1494 - Worker
  • Worker 1495 - Worker

Load: 12.88 m³

Duration: 00:13:41

Travel Duration: 00:04:41

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:18

Slack: 22:15:41

Path info

Path ID: 194957

Truck: Truck auto 899 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 898 - Driver
  • Worker 1794 - Worker
  • Worker 1795 - Worker

Load: 15.71 m³

Duration: 00:10:54

Travel Duration: 00:02:54

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:31

Slack: 22:18:28

Path info

Path ID: 194958

Truck: Truck auto 907 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 906 - Driver
  • Worker 1810 - Worker
  • Worker 1811 - Worker

Load: 15.61 m³

Duration: 00:17:00

Travel Duration: 00:07:00

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:37

Slack: 22:12:22

Path info

Path ID: 194959

Truck: Truck auto 987 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 986 - Driver
  • Worker 1970 - Worker
  • Worker 1971 - Worker

Load: 15.97 m³

Duration: 00:14:02

Travel Duration: 00:05:02

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:39

Slack: 22:15:20

Path info

Path ID: 194960

Truck: Truck auto 20 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 19 - Driver
  • Worker 36 - Worker
  • Worker 37 - Worker

Load: 15.84 m³

Duration: 00:15:18

Travel Duration: 00:06:18

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:55

Slack: 22:14:04

Path info

Path ID: 194961

Truck: Truck auto 36 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 35 - Driver
  • Worker 68 - Worker
  • Worker 69 - Worker

Load: 15.93 m³

Duration: 00:15:03

Travel Duration: 00:05:03

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:40

Slack: 22:14:19

Path info

Path ID: 194962

Truck: Truck auto 86 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 85 - Driver
  • Worker 168 - Worker
  • Worker 169 - Worker

Load: 15.69 m³

Duration: 00:14:24

Travel Duration: 00:05:24

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:01

Slack: 22:14:58

Path info

Path ID: 194963

Truck: Truck auto 154 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 153 - Driver
  • Worker 304 - Worker
  • Worker 305 - Worker

Load: 15.87 m³

Duration: 00:15:31

Travel Duration: 00:05:31

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:08

Slack: 22:13:51

Path info

Path ID: 194964

Truck: Truck auto 226 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 225 - Driver
  • Worker 448 - Worker
  • Worker 449 - Worker

Load: 15.92 m³

Duration: 00:16:24

Travel Duration: 00:06:24

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:01

Slack: 22:12:58

Path info

Path ID: 194965

Truck: Truck auto 294 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 293 - Driver
  • Worker 584 - Worker
  • Worker 585 - Worker

Load: 15.7 m³

Duration: 00:17:49

Travel Duration: 00:06:49

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:26

Slack: 22:11:33

Path info

Path ID: 194966

Truck: Truck auto 300 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 299 - Driver
  • Worker 596 - Worker
  • Worker 597 - Worker

Load: 15.88 m³

Duration: 00:15:53

Travel Duration: 00:05:53

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:30

Slack: 22:13:29

Path info

Path ID: 194967

Truck: Truck auto 340 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 339 - Driver
  • Worker 676 - Worker
  • Worker 677 - Worker

Load: 15.99 m³

Duration: 00:14:52

Travel Duration: 00:05:52

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:29

Slack: 22:14:30

Path info

Path ID: 194968

Truck: Truck auto 360 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 359 - Driver
  • Worker 716 - Worker
  • Worker 717 - Worker

Load: 15.43 m³

Duration: 00:16:07

Travel Duration: 00:06:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:44

Slack: 22:13:15

Path info

Path ID: 194969

Truck: Truck auto 386 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 385 - Driver
  • Worker 768 - Worker
  • Worker 769 - Worker

Load: 15.9 m³

Duration: 00:17:12

Travel Duration: 00:06:12

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:49

Slack: 22:12:10

Path info

Path ID: 194970

Truck: Truck auto 394 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 393 - Driver
  • Worker 784 - Worker
  • Worker 785 - Worker

Load: 15.94 m³

Duration: 00:13:20

Travel Duration: 00:04:20

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:57

Slack: 22:16:02

Path info

Path ID: 194971

Truck: Truck auto 412 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 411 - Driver
  • Worker 820 - Worker
  • Worker 821 - Worker

Load: 15.68 m³

Duration: 00:17:12

Travel Duration: 00:06:12

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:49

Slack: 22:12:10

Path info

Path ID: 194972

Truck: Truck auto 464 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 463 - Driver
  • Worker 924 - Worker
  • Worker 925 - Worker

Load: 16.0 m³

Duration: 00:16:20

Travel Duration: 00:06:20

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:57

Slack: 22:13:02

Path info

Path ID: 194973

Truck: Truck auto 524 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 523 - Driver
  • Worker 1044 - Worker
  • Worker 1045 - Worker

Load: 14.1 m³

Duration: 00:13:14

Travel Duration: 00:04:14

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:51

Slack: 22:16:08

Path info

Path ID: 194974

Truck: Truck auto 590 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 589 - Driver
  • Worker 1176 - Worker
  • Worker 1177 - Worker

Load: 13.62 m³

Duration: 00:12:02

Travel Duration: 00:04:02

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:39

Slack: 22:17:20

Path info

Path ID: 194975

Truck: Truck auto 642 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 641 - Driver
  • Worker 1280 - Worker
  • Worker 1281 - Worker

Load: 15.48 m³

Duration: 00:13:08

Travel Duration: 00:04:08

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:45

Slack: 22:16:14

Path info

Path ID: 194976

Truck: Truck auto 706 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 705 - Driver
  • Worker 1408 - Worker
  • Worker 1409 - Worker

Load: 15.49 m³

Duration: 00:13:55

Travel Duration: 00:04:55

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:32

Slack: 22:15:27

Path info

Path ID: 194977

Truck: Truck auto 756 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 755 - Driver
  • Worker 1508 - Worker
  • Worker 1509 - Worker

Load: 15.89 m³

Duration: 00:17:09

Travel Duration: 00:06:09

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:46

Slack: 22:12:13

Path info

Path ID: 194978

Truck: Truck auto 772 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 771 - Driver
  • Worker 1540 - Worker
  • Worker 1541 - Worker

Load: 15.26 m³

Duration: 00:15:12

Travel Duration: 00:05:12

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:49

Slack: 22:14:10

Path info

Path ID: 194979

Truck: Truck auto 924 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 923 - Driver
  • Worker 1844 - Worker
  • Worker 1845 - Worker

Load: 14.74 m³

Duration: 00:13:33

Travel Duration: 00:05:33

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:10

Slack: 22:15:49

Path info

Path ID: 194980

Truck: Truck 3 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • person2 - Driver
  • person6 - Worker
  • person7 - Worker

Load: 15.41 m³

Duration: 00:16:58

Travel Duration: 00:05:58

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:35

Slack: 22:12:24

Path info

Path ID: 194981

Truck: Truck auto 9 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 8 - Driver
  • Worker 14 - Worker
  • Worker 15 - Worker

Load: 15.75 m³

Duration: 00:17:51

Travel Duration: 00:06:51

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:28

Slack: 22:11:31

Path info

Path ID: 194982

Truck: Truck auto 13 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 12 - Driver
  • Worker 22 - Worker
  • Worker 23 - Worker

Load: 14.26 m³

Duration: 00:16:36

Travel Duration: 00:06:36

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:13

Slack: 22:12:46

Path info

Path ID: 194983

Truck: Truck auto 45 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 44 - Driver
  • Worker 86 - Worker
  • Worker 87 - Worker

Load: 15.87 m³

Duration: 00:14:39

Travel Duration: 00:05:39

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:16

Slack: 22:14:43

Path info

Path ID: 194984

Truck: Truck auto 53 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 52 - Driver
  • Worker 102 - Worker
  • Worker 103 - Worker

Load: 14.68 m³

Duration: 00:14:34

Travel Duration: 00:05:34

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:11

Slack: 22:14:48

Path info

Path ID: 194985

Truck: Truck auto 125 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 124 - Driver
  • Worker 246 - Worker
  • Worker 247 - Worker

Load: 15.39 m³

Duration: 00:16:10

Travel Duration: 00:05:10

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:47

Slack: 22:13:12

Path info

Path ID: 194986

Truck: Truck auto 139 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 138 - Driver
  • Worker 274 - Worker
  • Worker 275 - Worker

Load: 15.95 m³

Duration: 00:16:27

Travel Duration: 00:06:27

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:04

Slack: 22:12:55

Path info

Path ID: 194987

Truck: Truck auto 149 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 148 - Driver
  • Worker 294 - Worker
  • Worker 295 - Worker

Load: 15.26 m³

Duration: 00:15:23

Travel Duration: 00:06:23

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:00

Slack: 22:13:59

Path info

Path ID: 194988

Truck: Truck auto 171 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 170 - Driver
  • Worker 338 - Worker
  • Worker 339 - Worker

Load: 15.67 m³

Duration: 00:15:56

Travel Duration: 00:05:56

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:33

Slack: 22:13:26

Path info

Path ID: 194989

Truck: Truck auto 199 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 198 - Driver
  • Worker 394 - Worker
  • Worker 395 - Worker

Load: 15.74 m³

Duration: 00:14:02

Travel Duration: 00:05:02

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:39

Slack: 22:15:20

Path info

Path ID: 194990

Truck: Truck auto 215 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 214 - Driver
  • Worker 426 - Worker
  • Worker 427 - Worker

Load: 14.15 m³

Duration: 00:12:56

Travel Duration: 00:03:56

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:33

Slack: 22:16:26

Path info

Path ID: 194991

Truck: Truck auto 229 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 228 - Driver
  • Worker 454 - Worker
  • Worker 455 - Worker

Load: 14.37 m³

Duration: 00:13:52

Travel Duration: 00:04:52

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:29

Slack: 22:15:30

Path info

Path ID: 194992

Truck: Truck auto 405 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 404 - Driver
  • Worker 806 - Worker
  • Worker 807 - Worker

Load: 15.45 m³

Duration: 00:15:31

Travel Duration: 00:05:31

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:08

Slack: 22:13:51

Path info

Path ID: 194993

Truck: Truck auto 417 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 416 - Driver
  • Worker 830 - Worker
  • Worker 831 - Worker

Load: 12.32 m³

Duration: 00:10:17

Travel Duration: 00:03:17

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:40:54

Slack: 22:19:05

Path info

Path ID: 194994

Truck: Truck auto 463 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 462 - Driver
  • Worker 922 - Worker
  • Worker 923 - Worker

Load: 15.95 m³

Duration: 00:15:16

Travel Duration: 00:05:16

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:53

Slack: 22:14:06

Path info

Path ID: 194995

Truck: Truck auto 539 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 538 - Driver
  • Worker 1074 - Worker
  • Worker 1075 - Worker

Load: 15.29 m³

Duration: 00:18:01

Travel Duration: 00:06:01

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:38

Slack: 22:11:21

Path info

Path ID: 194996

Truck: Truck auto 579 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 578 - Driver
  • Worker 1154 - Worker
  • Worker 1155 - Worker

Load: 14.94 m³

Duration: 00:15:44

Travel Duration: 00:05:44

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:21

Slack: 22:13:38

Path info

Path ID: 194997

Truck: Truck auto 671 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 670 - Driver
  • Worker 1338 - Worker
  • Worker 1339 - Worker

Load: 15.99 m³

Duration: 00:15:08

Travel Duration: 00:04:08

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:45

Slack: 22:14:14

Path info

Path ID: 194998

Truck: Truck auto 747 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 746 - Driver
  • Worker 1490 - Worker
  • Worker 1491 - Worker

Load: 14.67 m³

Duration: 00:15:49

Travel Duration: 00:06:49

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:26

Slack: 22:13:33

Path info

Path ID: 194999

Truck: Truck auto 929 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 928 - Driver
  • Worker 1854 - Worker
  • Worker 1855 - Worker

Load: 15.82 m³

Duration: 00:16:19

Travel Duration: 00:06:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:56

Slack: 22:13:03

Path info

Path ID: 195000

Truck: Truck auto 2 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 1 - Driver
  • person14 - Worker
  • Worker 1 - Worker

Load: 15.83 m³

Duration: 00:16:27

Travel Duration: 00:05:27

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:04

Slack: 22:12:55

Path info

Path ID: 195001

Truck: Truck auto 18 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 17 - Driver
  • Worker 32 - Worker
  • Worker 33 - Worker

Load: 15.83 m³

Duration: 00:15:01

Travel Duration: 00:05:01

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:38

Slack: 22:14:21

Path info

Path ID: 195002

Truck: Truck auto 64 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 63 - Driver
  • Worker 124 - Worker
  • Worker 125 - Worker

Load: 15.88 m³

Duration: 00:13:23

Travel Duration: 00:04:23

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:00

Slack: 22:15:59

Path info

Path ID: 195003

Truck: Truck auto 110 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 109 - Driver
  • Worker 216 - Worker
  • Worker 217 - Worker

Load: 15.2 m³

Duration: 00:13:19

Travel Duration: 00:02:19

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:56

Slack: 22:16:03

Path info

Path ID: 195004

Truck: Truck auto 168 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 167 - Driver
  • Worker 332 - Worker
  • Worker 333 - Worker

Load: 15.26 m³

Duration: 00:12:57

Travel Duration: 00:03:57

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:34

Slack: 22:16:25

Path info

Path ID: 195005

Truck: Truck auto 176 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 175 - Driver
  • Worker 348 - Worker
  • Worker 349 - Worker

Load: 14.73 m³

Duration: 00:11:54

Travel Duration: 00:02:54

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:31

Slack: 22:17:28

Path info

Path ID: 195006

Truck: Truck auto 200 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 199 - Driver
  • Worker 396 - Worker
  • Worker 397 - Worker

Load: 11.3 m³

Duration: 00:09:26

Travel Duration: 00:02:26

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:40:03

Slack: 22:19:56

Path info

Path ID: 195007

Truck: Truck auto 206 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 205 - Driver
  • Worker 408 - Worker
  • Worker 409 - Worker

Load: 15.87 m³

Duration: 00:11:59

Travel Duration: 00:02:59

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:36

Slack: 22:17:23

Path info

Path ID: 195008

Truck: Truck auto 210 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 209 - Driver
  • Worker 416 - Worker
  • Worker 417 - Worker

Load: 15.89 m³

Duration: 00:13:54

Travel Duration: 00:03:54

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:31

Slack: 22:15:28

Path info

Path ID: 195009

Truck: Truck auto 216 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 215 - Driver
  • Worker 428 - Worker
  • Worker 429 - Worker

Load: 15.99 m³

Duration: 00:17:31

Travel Duration: 00:05:31

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:08

Slack: 22:11:51

Path info

Path ID: 195010

Truck: Truck auto 218 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 217 - Driver
  • Worker 432 - Worker
  • Worker 433 - Worker

Load: 15.89 m³

Duration: 00:14:17

Travel Duration: 00:04:17

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:54

Slack: 22:15:05

Path info

Path ID: 195011

Truck: Truck auto 236 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 235 - Driver
  • Worker 468 - Worker
  • Worker 469 - Worker

Load: 12.37 m³

Duration: 00:11:36

Travel Duration: 00:03:36

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:13

Slack: 22:17:46

Path info

Path ID: 195012

Truck: Truck auto 276 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 275 - Driver
  • Worker 548 - Worker
  • Worker 549 - Worker

Load: 15.86 m³

Duration: 00:17:02

Travel Duration: 00:05:02

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:39

Slack: 22:12:20

Path info

Path ID: 195013

Truck: Truck auto 300 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 299 - Driver
  • Worker 596 - Worker
  • Worker 597 - Worker

Load: 15.93 m³

Duration: 00:13:54

Travel Duration: 00:03:54

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:31

Slack: 22:15:28

Path info

Path ID: 195014

Truck: Truck auto 358 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 357 - Driver
  • Worker 712 - Worker
  • Worker 713 - Worker

Load: 15.97 m³

Duration: 00:13:40

Travel Duration: 00:03:40

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:17

Slack: 22:15:42

Path info

Path ID: 195015

Truck: Truck auto 402 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 401 - Driver
  • Worker 800 - Worker
  • Worker 801 - Worker

Load: 14.59 m³

Duration: 00:12:07

Travel Duration: 00:03:07

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:44

Slack: 22:17:15

Path info

Path ID: 195016

Truck: Truck auto 426 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 425 - Driver
  • Worker 848 - Worker
  • Worker 849 - Worker

Load: 15.76 m³

Duration: 00:16:11

Travel Duration: 00:05:11

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:48

Slack: 22:13:11

Path info

Path ID: 195017

Truck: Truck auto 432 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 431 - Driver
  • Worker 860 - Worker
  • Worker 861 - Worker

Load: 15.91 m³

Duration: 00:15:00

Travel Duration: 00:05:00

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:37

Slack: 22:14:22

Path info

Path ID: 195018

Truck: Truck auto 578 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 577 - Driver
  • Worker 1152 - Worker
  • Worker 1153 - Worker

Load: 15.74 m³

Duration: 00:13:55

Travel Duration: 00:03:55

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:32

Slack: 22:15:27

Path info

Path ID: 195019

Truck: Truck auto 580 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 579 - Driver
  • Worker 1156 - Worker
  • Worker 1157 - Worker

Load: 15.29 m³

Duration: 00:13:04

Travel Duration: 00:03:04

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:41

Slack: 22:16:18

Path info

Path ID: 195020

Truck: Truck auto 582 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 581 - Driver
  • Worker 1160 - Worker
  • Worker 1161 - Worker

Load: 15.88 m³

Duration: 00:13:31

Travel Duration: 00:02:31

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:08

Slack: 22:15:51

Path info

Path ID: 195021

Truck: Truck auto 672 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 671 - Driver
  • Worker 1340 - Worker
  • Worker 1341 - Worker

Load: 15.96 m³

Duration: 00:13:29

Travel Duration: 00:04:29

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:06

Slack: 22:15:53

Path info

Path ID: 195022

Truck: Truck auto 674 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 673 - Driver
  • Worker 1344 - Worker
  • Worker 1345 - Worker

Load: 15.49 m³

Duration: 00:16:17

Travel Duration: 00:06:17

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:54

Slack: 22:13:05

Path info

Path ID: 195023

Truck: Truck auto 680 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 679 - Driver
  • Worker 1356 - Worker
  • Worker 1357 - Worker

Load: 15.69 m³

Duration: 00:13:48

Travel Duration: 00:03:48

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:25

Slack: 22:15:34

Path info

Path ID: 195024

Truck: Truck auto 816 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 815 - Driver
  • Worker 1628 - Worker
  • Worker 1629 - Worker

Load: 15.88 m³

Duration: 00:14:38

Travel Duration: 00:03:38

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:15

Slack: 22:14:44

Path info

Path ID: 195025

Truck: Truck auto 844 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 843 - Driver
  • Worker 1684 - Worker
  • Worker 1685 - Worker

Load: 15.94 m³

Duration: 00:13:49

Travel Duration: 00:03:49

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:26

Slack: 22:15:33

Path info

Path ID: 195026

Truck: Truck auto 846 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 845 - Driver
  • Worker 1688 - Worker
  • Worker 1689 - Worker

Load: 15.99 m³

Duration: 00:14:48

Travel Duration: 00:03:48

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:25

Slack: 22:14:34

Path info

Path ID: 195027

Truck: Truck auto 872 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 871 - Driver
  • Worker 1740 - Worker
  • Worker 1741 - Worker

Load: 15.15 m³

Duration: 00:12:23

Travel Duration: 00:03:23

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:00

Slack: 22:16:59

Path info

Path ID: 195028

Truck: Truck auto 902 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 901 - Driver
  • Worker 1800 - Worker
  • Worker 1801 - Worker

Load: 15.95 m³

Duration: 00:15:51

Travel Duration: 00:04:51

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:28

Slack: 22:13:31

Path info

Path ID: 195029

Truck: Truck auto 974 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 973 - Driver
  • Worker 1944 - Worker
  • Worker 1945 - Worker

Load: 15.37 m³

Duration: 00:12:47

Travel Duration: 00:03:47

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:24

Slack: 22:16:35

Path info

Path ID: 195030

Truck: Truck auto 1 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • person10 - Driver
  • person12 - Worker
  • person13 - Worker

Load: 15.97 m³

Duration: 00:14:20

Travel Duration: 00:03:20

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:57

Slack: 22:15:02

Path info

Path ID: 195031

Truck: Truck auto 23 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 22 - Driver
  • Worker 42 - Worker
  • Worker 43 - Worker

Load: 15.14 m³

Duration: 00:14:37

Travel Duration: 00:04:37

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:14

Slack: 22:14:45

Path info

Path ID: 195032

Truck: Truck auto 27 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 26 - Driver
  • Worker 50 - Worker
  • Worker 51 - Worker

Load: 15.84 m³

Duration: 00:15:28

Travel Duration: 00:03:28

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:05

Slack: 22:13:54

Path info

Path ID: 195033

Truck: Truck auto 39 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 38 - Driver
  • Worker 74 - Worker
  • Worker 75 - Worker

Load: 16.0 m³

Duration: 00:13:00

Travel Duration: 00:04:00

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:37

Slack: 22:16:22

Path info

Path ID: 195034

Truck: Truck auto 61 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 60 - Driver
  • Worker 118 - Worker
  • Worker 119 - Worker

Load: 14.64 m³

Duration: 00:15:15

Travel Duration: 00:05:15

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:52

Slack: 22:14:07

Path info

Path ID: 195035

Truck: Truck auto 97 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 96 - Driver
  • Worker 190 - Worker
  • Worker 191 - Worker

Load: 15.27 m³

Duration: 00:11:55

Travel Duration: 00:02:55

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:32

Slack: 22:17:27

Path info

Path ID: 195036

Truck: Truck auto 115 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 114 - Driver
  • Worker 226 - Worker
  • Worker 227 - Worker

Load: 15.86 m³

Duration: 00:15:14

Travel Duration: 00:05:14

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:51

Slack: 22:14:08

Path info

Path ID: 195037

Truck: Truck auto 133 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 132 - Driver
  • Worker 262 - Worker
  • Worker 263 - Worker

Load: 15.55 m³

Duration: 00:14:41

Travel Duration: 00:03:41

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:18

Slack: 22:14:41

Path info

Path ID: 195038

Truck: Truck auto 151 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 150 - Driver
  • Worker 298 - Worker
  • Worker 299 - Worker

Load: 15.31 m³

Duration: 00:11:22

Travel Duration: 00:02:22

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:59

Slack: 22:18:00

Path info

Path ID: 195039

Truck: Truck auto 167 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 166 - Driver
  • Worker 330 - Worker
  • Worker 331 - Worker

Load: 14.13 m³

Duration: 00:11:30

Travel Duration: 00:02:30

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:07

Slack: 22:17:52

Path info

Path ID: 195040

Truck: Truck auto 175 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 174 - Driver
  • Worker 346 - Worker
  • Worker 347 - Worker

Load: 15.22 m³

Duration: 00:15:02

Travel Duration: 00:05:02

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:39

Slack: 22:14:20

Path info

Path ID: 195041

Truck: Truck auto 209 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 208 - Driver
  • Worker 414 - Worker
  • Worker 415 - Worker

Load: 15.85 m³

Duration: 00:15:10

Travel Duration: 00:05:10

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:47

Slack: 22:14:12

Path info

Path ID: 195042

Truck: Truck auto 229 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 228 - Driver
  • Worker 454 - Worker
  • Worker 455 - Worker

Load: 14.06 m³

Duration: 00:12:54

Travel Duration: 00:04:54

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:31

Slack: 22:16:28

Path info

Path ID: 195043

Truck: Truck auto 235 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 234 - Driver
  • Worker 466 - Worker
  • Worker 467 - Worker

Load: 15.42 m³

Duration: 00:11:51

Travel Duration: 00:02:51

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:28

Slack: 22:17:31

Path info

Path ID: 195044

Truck: Truck auto 271 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 270 - Driver
  • Worker 538 - Worker
  • Worker 539 - Worker

Load: 15.98 m³

Duration: 00:11:17

Travel Duration: 00:03:17

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:54

Slack: 22:18:05

Path info

Path ID: 195045

Truck: Truck auto 293 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 292 - Driver
  • Worker 582 - Worker
  • Worker 583 - Worker

Load: 10.19 m³

Duration: 00:10:56

Travel Duration: 00:03:56

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:33

Slack: 22:18:26

Path info

Path ID: 195046

Truck: Truck auto 321 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 320 - Driver
  • Worker 638 - Worker
  • Worker 639 - Worker

Load: 15.86 m³

Duration: 00:13:55

Travel Duration: 00:04:55

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:32

Slack: 22:15:27

Path info

Path ID: 195047

Truck: Truck auto 351 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 350 - Driver
  • Worker 698 - Worker
  • Worker 699 - Worker

Load: 15.93 m³

Duration: 00:14:22

Travel Duration: 00:04:22

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:59

Slack: 22:15:00

Path info

Path ID: 195048

Truck: Truck auto 417 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 416 - Driver
  • Worker 830 - Worker
  • Worker 831 - Worker

Load: 15.94 m³

Duration: 00:11:51

Travel Duration: 00:02:51

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:28

Slack: 22:17:31

Path info

Path ID: 195049

Truck: Truck auto 485 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 484 - Driver
  • Worker 966 - Worker
  • Worker 967 - Worker

Load: 8.8 m³

Duration: 00:07:51

Travel Duration: 00:02:51

Wait Duration: 00:00:00

Service Duration: 00:05:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:38:28

Slack: 22:21:31

Path info

Path ID: 195050

Truck: Truck auto 521 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 520 - Driver
  • Worker 1038 - Worker
  • Worker 1039 - Worker

Load: 14.82 m³

Duration: 00:12:07

Travel Duration: 00:03:07

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:44

Slack: 22:17:15

Path info

Path ID: 195051

Truck: Truck auto 523 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 522 - Driver
  • Worker 1042 - Worker
  • Worker 1043 - Worker

Load: 15.7 m³

Duration: 00:14:00

Travel Duration: 00:04:00

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:37

Slack: 22:15:22

Path info

Path ID: 195052

Truck: Truck auto 559 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 558 - Driver
  • Worker 1114 - Worker
  • Worker 1115 - Worker

Load: 14.05 m³

Duration: 00:15:12

Travel Duration: 00:05:12

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:49

Slack: 22:14:10

Path info

Path ID: 195053

Truck: Truck auto 601 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 600 - Driver
  • Worker 1198 - Worker
  • Worker 1199 - Worker

Load: 9.96 m³

Duration: 00:09:34

Travel Duration: 00:02:34

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:40:11

Slack: 22:19:48

Path info

Path ID: 195054

Truck: Truck auto 607 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 606 - Driver
  • Worker 1210 - Worker
  • Worker 1211 - Worker

Load: 15.36 m³

Duration: 00:12:21

Travel Duration: 00:03:21

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:58

Slack: 22:17:01

Path info

Path ID: 195055

Truck: Truck auto 639 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 638 - Driver
  • Worker 1274 - Worker
  • Worker 1275 - Worker

Load: 15.32 m³

Duration: 00:11:07

Travel Duration: 00:03:07

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:44

Slack: 22:18:15

Path info

Path ID: 195056

Truck: Truck auto 711 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 710 - Driver
  • Worker 1418 - Worker
  • Worker 1419 - Worker

Load: 14.66 m³

Duration: 00:14:55

Travel Duration: 00:04:55

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:32

Slack: 22:14:27

Path info

Path ID: 195057

Truck: Truck auto 723 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 722 - Driver
  • Worker 1442 - Worker
  • Worker 1443 - Worker

Load: 15.97 m³

Duration: 00:16:24

Travel Duration: 00:04:24

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:01

Slack: 22:12:58

Path info

Path ID: 195058

Truck: Truck auto 727 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 726 - Driver
  • Worker 1450 - Worker
  • Worker 1451 - Worker

Load: 15.86 m³

Duration: 00:14:03

Travel Duration: 00:04:03

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:40

Slack: 22:15:19

Path info

Path ID: 195059

Truck: Truck auto 945 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 944 - Driver
  • Worker 1886 - Worker
  • Worker 1887 - Worker

Load: 15.78 m³

Duration: 00:12:24

Travel Duration: 00:03:24

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:01

Slack: 22:16:58

Path info

Path ID: 195060

Truck: Truck auto 999 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 998 - Driver
  • Worker 1994 - Worker
  • Worker 1995 - Worker

Load: 15.41 m³

Duration: 00:13:33

Travel Duration: 00:03:33

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:10

Slack: 22:15:49

Path info

Path ID: 195061

Truck: Truck auto 43 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 42 - Driver
  • Worker 82 - Worker
  • Worker 83 - Worker

Load: 12.72 m³

Duration: 00:12:48

Travel Duration: 00:04:48

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:25

Slack: 22:16:34

Path info

Path ID: 195062

Truck: Truck auto 69 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 68 - Driver
  • Worker 134 - Worker
  • Worker 135 - Worker

Load: 15.94 m³

Duration: 00:16:22

Travel Duration: 00:06:22

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:59

Slack: 22:13:00

Path info

Path ID: 195063

Truck: Truck auto 97 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 96 - Driver
  • Worker 190 - Worker
  • Worker 191 - Worker

Load: 15.96 m³

Duration: 00:14:19

Travel Duration: 00:04:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:56

Slack: 22:15:03

Path info

Path ID: 195064

Truck: Truck auto 123 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 122 - Driver
  • Worker 242 - Worker
  • Worker 243 - Worker

Load: 15.38 m³

Duration: 00:15:56

Travel Duration: 00:05:56

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:33

Slack: 22:13:26

Path info

Path ID: 195065

Truck: Truck auto 141 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 140 - Driver
  • Worker 278 - Worker
  • Worker 279 - Worker

Load: 14.45 m³

Duration: 00:13:03

Travel Duration: 00:04:03

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:40

Slack: 22:16:19

Path info

Path ID: 195066

Truck: Truck auto 167 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 166 - Driver
  • Worker 330 - Worker
  • Worker 331 - Worker

Load: 15.97 m³

Duration: 00:17:26

Travel Duration: 00:06:26

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:03

Slack: 22:11:56

Path info

Path ID: 195067

Truck: Truck auto 235 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 234 - Driver
  • Worker 466 - Worker
  • Worker 467 - Worker

Load: 13.38 m³

Duration: 00:12:16

Travel Duration: 00:04:16

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:53

Slack: 22:17:06

Path info

Path ID: 195068

Truck: Truck auto 245 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 244 - Driver
  • Worker 486 - Worker
  • Worker 487 - Worker

Load: 15.69 m³

Duration: 00:19:16

Travel Duration: 00:07:16

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:53

Slack: 22:10:06

Path info

Path ID: 195069

Truck: Truck auto 269 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 268 - Driver
  • Worker 534 - Worker
  • Worker 535 - Worker

Load: 14.8 m³

Duration: 00:13:56

Travel Duration: 00:04:56

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:33

Slack: 22:15:26

Path info

Path ID: 195070

Truck: Truck auto 297 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 296 - Driver
  • Worker 590 - Worker
  • Worker 591 - Worker

Load: 15.55 m³

Duration: 00:18:20

Travel Duration: 00:07:20

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:57

Slack: 22:11:02

Path info

Path ID: 195071

Truck: Truck auto 369 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 368 - Driver
  • Worker 734 - Worker
  • Worker 735 - Worker

Load: 15.63 m³

Duration: 00:16:34

Travel Duration: 00:06:34

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:11

Slack: 22:12:48

Path info

Path ID: 195072

Truck: Truck auto 403 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 402 - Driver
  • Worker 802 - Worker
  • Worker 803 - Worker

Load: 15.94 m³

Duration: 00:13:53

Travel Duration: 00:04:53

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:30

Slack: 22:15:29

Path info

Path ID: 195073

Truck: Truck auto 497 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 496 - Driver
  • Worker 990 - Worker
  • Worker 991 - Worker

Load: 15.91 m³

Duration: 00:14:44

Travel Duration: 00:05:44

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:21

Slack: 22:14:38

Path info

Path ID: 195074

Truck: Truck auto 507 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 506 - Driver
  • Worker 1010 - Worker
  • Worker 1011 - Worker

Load: 15.11 m³

Duration: 00:16:13

Travel Duration: 00:06:13

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:50

Slack: 22:13:09

Path info

Path ID: 195075

Truck: Truck auto 509 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 508 - Driver
  • Worker 1014 - Worker
  • Worker 1015 - Worker

Load: 15.6 m³

Duration: 00:17:31

Travel Duration: 00:07:31

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:08

Slack: 22:11:51

Path info

Path ID: 195076

Truck: Truck auto 531 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 530 - Driver
  • Worker 1058 - Worker
  • Worker 1059 - Worker

Load: 15.79 m³

Duration: 00:16:32

Travel Duration: 00:06:32

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:09

Slack: 22:12:50

Path info

Path ID: 195077

Truck: Truck auto 581 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 580 - Driver
  • Worker 1158 - Worker
  • Worker 1159 - Worker

Load: 15.91 m³

Duration: 00:16:19

Travel Duration: 00:06:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:56

Slack: 22:13:03

Path info

Path ID: 195078

Truck: Truck auto 607 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 606 - Driver
  • Worker 1210 - Worker
  • Worker 1211 - Worker

Load: 15.55 m³

Duration: 00:16:24

Travel Duration: 00:05:24

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:01

Slack: 22:12:58

Path info

Path ID: 195079

Truck: Truck auto 611 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 610 - Driver
  • Worker 1218 - Worker
  • Worker 1219 - Worker

Load: 15.69 m³

Duration: 00:15:03

Travel Duration: 00:07:03

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:40

Slack: 22:14:19

Path info

Path ID: 195080

Truck: Truck auto 625 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 624 - Driver
  • Worker 1246 - Worker
  • Worker 1247 - Worker

Load: 15.88 m³

Duration: 00:17:12

Travel Duration: 00:06:12

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:49

Slack: 22:12:10

Path info

Path ID: 195081

Truck: Truck auto 641 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 640 - Driver
  • Worker 1278 - Worker
  • Worker 1279 - Worker

Load: 15.57 m³

Duration: 00:19:06

Travel Duration: 00:07:06

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:43

Slack: 22:10:16

Path info

Path ID: 195082

Truck: Truck auto 655 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 654 - Driver
  • Worker 1306 - Worker
  • Worker 1307 - Worker

Load: 15.43 m³

Duration: 00:15:01

Travel Duration: 00:05:01

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:38

Slack: 22:14:21

Path info

Path ID: 195083

Truck: Truck auto 681 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 680 - Driver
  • Worker 1358 - Worker
  • Worker 1359 - Worker

Load: 14.52 m³

Duration: 00:15:01

Travel Duration: 00:05:01

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:38

Slack: 22:14:21

Path info

Path ID: 195084

Truck: Truck auto 781 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 780 - Driver
  • Worker 1558 - Worker
  • Worker 1559 - Worker

Load: 14.78 m³

Duration: 00:15:58

Travel Duration: 00:06:58

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:35

Slack: 22:13:24

Path info

Path ID: 195085

Truck: Truck auto 789 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 788 - Driver
  • Worker 1574 - Worker
  • Worker 1575 - Worker

Load: 14.71 m³

Duration: 00:17:12

Travel Duration: 00:06:12

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:49

Slack: 22:12:10

Path info

Path ID: 195086

Truck: Truck auto 797 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 796 - Driver
  • Worker 1590 - Worker
  • Worker 1591 - Worker

Load: 14.76 m³

Duration: 00:11:38

Travel Duration: 00:03:38

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:15

Slack: 22:17:44

Path info

Path ID: 195087

Truck: Truck auto 807 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 806 - Driver
  • Worker 1610 - Worker
  • Worker 1611 - Worker

Load: 15.96 m³

Duration: 00:17:18

Travel Duration: 00:07:18

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:55

Slack: 22:12:04

Path info

Path ID: 195088

Truck: Truck auto 949 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 948 - Driver
  • Worker 1894 - Worker
  • Worker 1895 - Worker

Load: 14.67 m³

Duration: 00:13:24

Travel Duration: 00:04:24

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:01

Slack: 22:15:58

Path info

Path ID: 195089

Truck: Truck auto 20 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 19 - Driver
  • Worker 36 - Worker
  • Worker 37 - Worker

Load: 15.19 m³

Duration: 00:15:06

Travel Duration: 00:05:06

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:43

Slack: 22:14:16

Path info

Path ID: 195090

Truck: Truck auto 34 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 33 - Driver
  • Worker 64 - Worker
  • Worker 65 - Worker

Load: 14.43 m³

Duration: 00:17:02

Travel Duration: 00:07:02

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:39

Slack: 22:12:20

Path info

Path ID: 195091

Truck: Truck auto 42 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 41 - Driver
  • Worker 80 - Worker
  • Worker 81 - Worker

Load: 15.03 m³

Duration: 00:15:55

Travel Duration: 00:05:55

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:32

Slack: 22:13:27

Path info

Path ID: 195092

Truck: Truck auto 52 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 51 - Driver
  • Worker 100 - Worker
  • Worker 101 - Worker

Load: 15.83 m³

Duration: 00:15:22

Travel Duration: 00:06:22

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:59

Slack: 22:14:00

Path info

Path ID: 195093

Truck: Truck auto 56 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 55 - Driver
  • Worker 108 - Worker
  • Worker 109 - Worker

Load: 15.95 m³

Duration: 00:17:09

Travel Duration: 00:06:09

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:46

Slack: 22:12:13

Path info

Path ID: 195094

Truck: Truck auto 98 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 97 - Driver
  • Worker 192 - Worker
  • Worker 193 - Worker

Load: 15.61 m³

Duration: 00:18:48

Travel Duration: 00:07:48

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:25

Slack: 22:10:34

Path info

Path ID: 195095

Truck: Truck auto 122 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 121 - Driver
  • Worker 240 - Worker
  • Worker 241 - Worker

Load: 16.0 m³

Duration: 00:16:12

Travel Duration: 00:07:12

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:49

Slack: 22:13:10

Path info

Path ID: 195096

Truck: Truck auto 126 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 125 - Driver
  • Worker 248 - Worker
  • Worker 249 - Worker

Load: 15.74 m³

Duration: 00:17:47

Travel Duration: 00:05:47

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:24

Slack: 22:11:35

Path info

Path ID: 195097

Truck: Truck auto 148 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 147 - Driver
  • Worker 292 - Worker
  • Worker 293 - Worker

Load: 14.66 m³

Duration: 00:17:24

Travel Duration: 00:06:24

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:01

Slack: 22:11:58

Path info

Path ID: 195098

Truck: Truck auto 272 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 271 - Driver
  • Worker 540 - Worker
  • Worker 541 - Worker

Load: 15.88 m³

Duration: 00:17:54

Travel Duration: 00:07:54

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:31

Slack: 22:11:28

Path info

Path ID: 195099

Truck: Truck auto 314 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 313 - Driver
  • Worker 624 - Worker
  • Worker 625 - Worker

Load: 15.96 m³

Duration: 00:15:22

Travel Duration: 00:05:22

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:59

Slack: 22:14:00

Path info

Path ID: 195100

Truck: Truck auto 594 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 593 - Driver
  • Worker 1184 - Worker
  • Worker 1185 - Worker

Load: 14.7 m³

Duration: 00:14:15

Travel Duration: 00:05:15

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:52

Slack: 22:15:07

Path info

Path ID: 195101

Truck: Truck auto 598 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 597 - Driver
  • Worker 1192 - Worker
  • Worker 1193 - Worker

Load: 15.63 m³

Duration: 00:14:58

Travel Duration: 00:04:58

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:35

Slack: 22:14:24

Path info

Path ID: 195102

Truck: Truck auto 660 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 659 - Driver
  • Worker 1316 - Worker
  • Worker 1317 - Worker

Load: 15.97 m³

Duration: 00:17:14

Travel Duration: 00:07:14

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:51

Slack: 22:12:08

Path info

Path ID: 195103

Truck: Truck auto 662 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 661 - Driver
  • Worker 1320 - Worker
  • Worker 1321 - Worker

Load: 15.9 m³

Duration: 00:15:45

Travel Duration: 00:04:45

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:22

Slack: 22:13:37

Path info

Path ID: 195104

Truck: Truck auto 670 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 669 - Driver
  • Worker 1336 - Worker
  • Worker 1337 - Worker

Load: 15.76 m³

Duration: 00:17:05

Travel Duration: 00:07:05

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:42

Slack: 22:12:17

Path info

Path ID: 195105

Truck: Truck auto 686 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 685 - Driver
  • Worker 1368 - Worker
  • Worker 1369 - Worker

Load: 15.91 m³

Duration: 00:15:51

Travel Duration: 00:06:51

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:28

Slack: 22:13:31

Path info

Path ID: 195106

Truck: Truck auto 778 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 777 - Driver
  • Worker 1552 - Worker
  • Worker 1553 - Worker

Load: 15.64 m³

Duration: 00:16:58

Travel Duration: 00:05:58

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:35

Slack: 22:12:24

Path info

Path ID: 195107

Truck: Truck auto 796 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 795 - Driver
  • Worker 1588 - Worker
  • Worker 1589 - Worker

Load: 15.48 m³

Duration: 00:17:29

Travel Duration: 00:07:29

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:06

Slack: 22:11:53

Path info

Path ID: 195108

Truck: Truck auto 826 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 825 - Driver
  • Worker 1648 - Worker
  • Worker 1649 - Worker

Load: 14.58 m³

Duration: 00:13:07

Travel Duration: 00:04:07

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:44

Slack: 22:16:15

Path info

Path ID: 195109

Truck: Truck auto 890 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 889 - Driver
  • Worker 1776 - Worker
  • Worker 1777 - Worker

Load: 15.56 m³

Duration: 00:17:38

Travel Duration: 00:06:38

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:15

Slack: 22:11:44

Path info

Path ID: 195110

Truck: Truck auto 892 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 891 - Driver
  • Worker 1780 - Worker
  • Worker 1781 - Worker

Load: 14.99 m³

Duration: 00:15:15

Travel Duration: 00:06:15

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:52

Slack: 22:14:07

Path info

Path ID: 195111

Truck: Truck auto 954 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 953 - Driver
  • Worker 1904 - Worker
  • Worker 1905 - Worker

Load: 15.98 m³

Duration: 00:16:39

Travel Duration: 00:05:39

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:16

Slack: 22:12:43

Path info

Path ID: 195112

Truck: Truck auto 966 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 965 - Driver
  • Worker 1928 - Worker
  • Worker 1929 - Worker

Load: 15.72 m³

Duration: 00:14:50

Travel Duration: 00:04:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:27

Slack: 22:14:32

Path info

Path ID: 195113

Truck: Truck auto 974 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 973 - Driver
  • Worker 1944 - Worker
  • Worker 1945 - Worker

Load: 15.91 m³

Duration: 00:15:55

Travel Duration: 00:04:55

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:32

Slack: 22:13:27

Path info

Path ID: 195114

Truck: Truck auto 996 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 995 - Driver
  • Worker 1988 - Worker
  • Worker 1989 - Worker

Load: 13.84 m³

Duration: 00:14:08

Travel Duration: 00:05:08

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:45

Slack: 22:15:14

Path info

Path ID: 195115

Truck: Truck auto 8 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 7 - Driver
  • Worker 12 - Worker
  • Worker 13 - Worker

Load: 15.85 m³

Duration: 00:20:36

Travel Duration: 00:08:36

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:51:13

Slack: 22:08:46

Path info

Path ID: 195116

Truck: Truck auto 42 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 41 - Driver
  • Worker 80 - Worker
  • Worker 81 - Worker

Load: 15.95 m³

Duration: 00:20:24

Travel Duration: 00:09:24

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:51:01

Slack: 22:08:58

Path info

Path ID: 195117

Truck: Truck auto 62 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 61 - Driver
  • Worker 120 - Worker
  • Worker 121 - Worker

Load: 15.57 m³

Duration: 00:20:08

Travel Duration: 00:10:08

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:45

Slack: 22:09:14

Path info

Path ID: 195118

Truck: Truck auto 100 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 99 - Driver
  • Worker 196 - Worker
  • Worker 197 - Worker

Load: 13.81 m³

Duration: 00:17:42

Travel Duration: 00:08:42

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:19

Slack: 22:11:40

Path info

Path ID: 195119

Truck: Truck auto 148 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 147 - Driver
  • Worker 292 - Worker
  • Worker 293 - Worker

Load: 15.96 m³

Duration: 00:19:07

Travel Duration: 00:09:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:44

Slack: 22:10:15

Path info

Path ID: 195120

Truck: Truck auto 154 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 153 - Driver
  • Worker 304 - Worker
  • Worker 305 - Worker

Load: 15.87 m³

Duration: 00:18:06

Travel Duration: 00:09:06

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:43

Slack: 22:11:16

Path info

Path ID: 195121

Truck: Truck auto 162 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 161 - Driver
  • Worker 320 - Worker
  • Worker 321 - Worker

Load: 15.93 m³

Duration: 00:18:04

Travel Duration: 00:08:04

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:41

Slack: 22:11:18

Path info

Path ID: 195122

Truck: Truck auto 200 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 199 - Driver
  • Worker 396 - Worker
  • Worker 397 - Worker

Load: 15.92 m³

Duration: 00:20:45

Travel Duration: 00:09:45

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:51:22

Slack: 22:08:37

Path info

Path ID: 195123

Truck: Truck auto 206 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 205 - Driver
  • Worker 408 - Worker
  • Worker 409 - Worker

Load: 15.95 m³

Duration: 00:19:11

Travel Duration: 00:09:11

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:48

Slack: 22:10:11

Path info

Path ID: 195124

Truck: Truck auto 234 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 233 - Driver
  • Worker 464 - Worker
  • Worker 465 - Worker

Load: 14.83 m³

Duration: 00:16:18

Travel Duration: 00:07:18

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:55

Slack: 22:13:04

Path info

Path ID: 195125

Truck: Truck auto 236 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 235 - Driver
  • Worker 468 - Worker
  • Worker 469 - Worker

Load: 15.95 m³

Duration: 00:20:02

Travel Duration: 00:09:02

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:39

Slack: 22:09:20

Path info

Path ID: 195126

Truck: Truck auto 248 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 247 - Driver
  • Worker 492 - Worker
  • Worker 493 - Worker

Load: 14.98 m³

Duration: 00:19:09

Travel Duration: 00:09:09

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:46

Slack: 22:10:13

Path info

Path ID: 195127

Truck: Truck auto 268 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 267 - Driver
  • Worker 532 - Worker
  • Worker 533 - Worker

Load: 15.99 m³

Duration: 00:18:30

Travel Duration: 00:07:30

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:07

Slack: 22:10:52

Path info

Path ID: 195128

Truck: Truck auto 304 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 303 - Driver
  • Worker 604 - Worker
  • Worker 605 - Worker

Load: 15.94 m³

Duration: 00:21:04

Travel Duration: 00:10:04

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:51:41

Slack: 22:08:18

Path info

Path ID: 195129

Truck: Truck auto 306 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 305 - Driver
  • Worker 608 - Worker
  • Worker 609 - Worker

Load: 15.86 m³

Duration: 00:17:00

Travel Duration: 00:08:00

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:37

Slack: 22:12:22

Path info

Path ID: 195130

Truck: Truck auto 412 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 411 - Driver
  • Worker 820 - Worker
  • Worker 821 - Worker

Load: 15.33 m³

Duration: 00:16:50

Travel Duration: 00:08:50

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:27

Slack: 22:12:32

Path info

Path ID: 195131

Truck: Truck auto 414 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 413 - Driver
  • Worker 824 - Worker
  • Worker 825 - Worker

Load: 15.66 m³

Duration: 00:20:21

Travel Duration: 00:08:21

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:58

Slack: 22:09:01

Path info

Path ID: 195132

Truck: Truck auto 420 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 419 - Driver
  • Worker 836 - Worker
  • Worker 837 - Worker

Load: 15.86 m³

Duration: 00:16:14

Travel Duration: 00:07:14

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:51

Slack: 22:13:08

Path info

Path ID: 195133

Truck: Truck auto 552 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 551 - Driver
  • Worker 1100 - Worker
  • Worker 1101 - Worker

Load: 15.63 m³

Duration: 00:19:07

Travel Duration: 00:09:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:44

Slack: 22:10:15

Path info

Path ID: 195134

Truck: Truck auto 618 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 617 - Driver
  • Worker 1232 - Worker
  • Worker 1233 - Worker

Load: 15.58 m³

Duration: 00:19:20

Travel Duration: 00:08:20

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:57

Slack: 22:10:02

Path info

Path ID: 195135

Truck: Truck auto 644 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 643 - Driver
  • Worker 1284 - Worker
  • Worker 1285 - Worker

Load: 15.73 m³

Duration: 00:16:36

Travel Duration: 00:06:36

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:13

Slack: 22:12:46

Path info

Path ID: 195136

Truck: Truck auto 654 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 653 - Driver
  • Worker 1304 - Worker
  • Worker 1305 - Worker

Load: 15.85 m³

Duration: 00:20:37

Travel Duration: 00:10:37

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:51:14

Slack: 22:08:45

Path info

Path ID: 195137

Truck: Truck auto 662 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 661 - Driver
  • Worker 1320 - Worker
  • Worker 1321 - Worker

Load: 15.83 m³

Duration: 00:20:09

Travel Duration: 00:09:09

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:46

Slack: 22:09:13

Path info

Path ID: 195138

Truck: Truck auto 738 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 737 - Driver
  • Worker 1472 - Worker
  • Worker 1473 - Worker

Load: 15.29 m³

Duration: 00:19:07

Travel Duration: 00:08:07

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:44

Slack: 22:10:15

Path info

Path ID: 195139

Truck: Truck auto 752 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 751 - Driver
  • Worker 1500 - Worker
  • Worker 1501 - Worker

Load: 15.6 m³

Duration: 00:17:12

Travel Duration: 00:07:12

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:49

Slack: 22:12:10

Path info

Path ID: 195140

Truck: Truck auto 762 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 761 - Driver
  • Worker 1520 - Worker
  • Worker 1521 - Worker

Load: 15.86 m³

Duration: 00:17:03

Travel Duration: 00:08:03

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:40

Slack: 22:12:19

Path info

Path ID: 195141

Truck: Truck auto 872 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 871 - Driver
  • Worker 1740 - Worker
  • Worker 1741 - Worker

Load: 15.19 m³

Duration: 00:15:10

Travel Duration: 00:07:10

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:47

Slack: 22:14:12

Path info

Path ID: 195142

Truck: Truck auto 896 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 895 - Driver
  • Worker 1788 - Worker
  • Worker 1789 - Worker

Load: 15.97 m³

Duration: 00:20:24

Travel Duration: 00:09:24

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:51:01

Slack: 22:08:58

Path info

Path ID: 195143

Truck: Truck auto 5 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 4 - Driver
  • Worker 6 - Worker
  • Worker 7 - Worker

Load: 15.79 m³

Duration: 00:17:46

Travel Duration: 00:07:46

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:23

Slack: 22:11:36

Path info

Path ID: 195144

Truck: Truck auto 27 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 26 - Driver
  • Worker 50 - Worker
  • Worker 51 - Worker

Load: 16.0 m³

Duration: 00:18:17

Travel Duration: 00:09:17

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:54

Slack: 22:11:05

Path info

Path ID: 195145

Truck: Truck auto 129 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 128 - Driver
  • Worker 254 - Worker
  • Worker 255 - Worker

Load: 15.71 m³

Duration: 00:21:13

Travel Duration: 00:10:13

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:51:50

Slack: 22:08:09

Path info

Path ID: 195146

Truck: Truck auto 161 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 160 - Driver
  • Worker 318 - Worker
  • Worker 319 - Worker

Load: 15.85 m³

Duration: 00:17:28

Travel Duration: 00:07:28

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:05

Slack: 22:11:54

Path info

Path ID: 195147

Truck: Truck auto 201 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 200 - Driver
  • Worker 398 - Worker
  • Worker 399 - Worker

Load: 15.52 m³

Duration: 00:21:52

Travel Duration: 00:10:52

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:52:29

Slack: 22:07:30

Path info

Path ID: 195148

Truck: Truck auto 217 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 216 - Driver
  • Worker 430 - Worker
  • Worker 431 - Worker

Load: 15.94 m³

Duration: 00:19:03

Travel Duration: 00:09:03

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:40

Slack: 22:10:19

Path info

Path ID: 195149

Truck: Truck auto 295 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 294 - Driver
  • Worker 586 - Worker
  • Worker 587 - Worker

Load: 15.82 m³

Duration: 00:17:09

Travel Duration: 00:07:09

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:46

Slack: 22:12:13

Path info

Path ID: 195150

Truck: Truck auto 327 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 326 - Driver
  • Worker 650 - Worker
  • Worker 651 - Worker

Load: 15.77 m³

Duration: 00:17:27

Travel Duration: 00:08:27

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:04

Slack: 22:11:55

Path info

Path ID: 195151

Truck: Truck auto 357 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 356 - Driver
  • Worker 710 - Worker
  • Worker 711 - Worker

Load: 15.89 m³

Duration: 00:19:01

Travel Duration: 00:09:01

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:38

Slack: 22:10:21

Path info

Path ID: 195152

Truck: Truck auto 373 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 372 - Driver
  • Worker 742 - Worker
  • Worker 743 - Worker

Load: 15.79 m³

Duration: 00:16:03

Travel Duration: 00:07:03

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:40

Slack: 22:13:19

Path info

Path ID: 195153

Truck: Truck auto 431 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 430 - Driver
  • Worker 858 - Worker
  • Worker 859 - Worker

Load: 15.71 m³

Duration: 00:16:24

Travel Duration: 00:07:24

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:01

Slack: 22:12:58

Path info

Path ID: 195154

Truck: Truck auto 433 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 432 - Driver
  • Worker 862 - Worker
  • Worker 863 - Worker

Load: 16.0 m³

Duration: 00:19:46

Travel Duration: 00:08:46

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:23

Slack: 22:09:36

Path info

Path ID: 195155

Truck: Truck auto 469 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 468 - Driver
  • Worker 934 - Worker
  • Worker 935 - Worker

Load: 15.98 m³

Duration: 00:18:34

Travel Duration: 00:08:34

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:11

Slack: 22:10:48

Path info

Path ID: 195156

Truck: Truck auto 479 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 478 - Driver
  • Worker 954 - Worker
  • Worker 955 - Worker

Load: 15.99 m³

Duration: 00:18:37

Travel Duration: 00:08:37

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:14

Slack: 22:10:45

Path info

Path ID: 195157

Truck: Truck auto 507 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 506 - Driver
  • Worker 1010 - Worker
  • Worker 1011 - Worker

Load: 15.92 m³

Duration: 00:18:59

Travel Duration: 00:08:59

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:36

Slack: 22:10:23

Path info

Path ID: 195158

Truck: Truck auto 525 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 524 - Driver
  • Worker 1046 - Worker
  • Worker 1047 - Worker

Load: 15.96 m³

Duration: 00:17:45

Travel Duration: 00:07:45

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:22

Slack: 22:11:37

Path info

Path ID: 195159

Truck: Truck auto 551 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 550 - Driver
  • Worker 1098 - Worker
  • Worker 1099 - Worker

Load: 15.58 m³

Duration: 00:18:20

Travel Duration: 00:08:20

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:57

Slack: 22:11:02

Path info

Path ID: 195160

Truck: Truck auto 555 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 554 - Driver
  • Worker 1106 - Worker
  • Worker 1107 - Worker

Load: 15.98 m³

Duration: 00:16:04

Travel Duration: 00:07:04

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:41

Slack: 22:13:18

Path info

Path ID: 195161

Truck: Truck auto 653 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 652 - Driver
  • Worker 1302 - Worker
  • Worker 1303 - Worker

Load: 15.95 m³

Duration: 00:18:51

Travel Duration: 00:08:51

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:28

Slack: 22:10:31

Path info

Path ID: 195162

Truck: Truck auto 663 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 662 - Driver
  • Worker 1322 - Worker
  • Worker 1323 - Worker

Load: 15.85 m³

Duration: 00:21:11

Travel Duration: 00:10:11

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:51:48

Slack: 22:08:11

Path info

Path ID: 195163

Truck: Truck auto 673 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 672 - Driver
  • Worker 1342 - Worker
  • Worker 1343 - Worker

Load: 15.99 m³

Duration: 00:19:20

Travel Duration: 00:09:20

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:57

Slack: 22:10:02

Path info

Path ID: 195164

Truck: Truck auto 689 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 688 - Driver
  • Worker 1374 - Worker
  • Worker 1375 - Worker

Load: 15.97 m³

Duration: 00:19:45

Travel Duration: 00:08:45

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:22

Slack: 22:09:37

Path info

Path ID: 195165

Truck: Truck auto 713 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 712 - Driver
  • Worker 1422 - Worker
  • Worker 1423 - Worker

Load: 15.83 m³

Duration: 00:21:04

Travel Duration: 00:10:04

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:51:41

Slack: 22:08:18

Path info

Path ID: 195166

Truck: Truck auto 783 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 782 - Driver
  • Worker 1562 - Worker
  • Worker 1563 - Worker

Load: 15.79 m³

Duration: 00:19:34

Travel Duration: 00:08:34

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:11

Slack: 22:09:48

Path info

Path ID: 195167

Truck: Truck auto 831 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 830 - Driver
  • Worker 1658 - Worker
  • Worker 1659 - Worker

Load: 15.95 m³

Duration: 00:20:05

Travel Duration: 00:09:05

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:42

Slack: 22:09:17

Path info

Path ID: 195168

Truck: Truck auto 947 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 946 - Driver
  • Worker 1890 - Worker
  • Worker 1891 - Worker

Load: 15.93 m³

Duration: 00:19:22

Travel Duration: 00:07:22

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:59

Slack: 22:10:00

Path info

Path ID: 195169

Truck: truckC - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 1000 - Driver
  • Worker 1998 - Worker
  • Worker 1999 - Worker

Load: 15.93 m³

Duration: 00:19:19

Travel Duration: 00:09:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:56

Slack: 22:10:03

Path info

Path ID: 195170

Truck: truckB - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • person1 - Driver
  • person3 - Worker
  • person4 - Worker
  • person5 - Worker

Load: 15.98 m³

Duration: 00:14:27

Travel Duration: 00:03:27

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:04

Slack: 22:14:55

Path info

Path ID: 195171

Truck: Truck auto 118 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 117 - Driver
  • Worker 232 - Worker
  • Worker 233 - Worker

Load: 14.81 m³

Duration: 00:14:11

Travel Duration: 00:04:11

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:48

Slack: 22:15:11

Path info

Path ID: 195172

Truck: Truck auto 132 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 131 - Driver
  • Worker 260 - Worker
  • Worker 261 - Worker

Load: 15.84 m³

Duration: 00:12:01

Travel Duration: 00:02:01

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:38

Slack: 22:17:21

Path info

Path ID: 195173

Truck: Truck auto 134 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 133 - Driver
  • Worker 264 - Worker
  • Worker 265 - Worker

Load: 15.36 m³

Duration: 00:11:18

Travel Duration: 00:02:18

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:55

Slack: 22:18:04

Path info

Path ID: 195174

Truck: Truck auto 144 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 143 - Driver
  • Worker 284 - Worker
  • Worker 285 - Worker

Load: 15.54 m³

Duration: 00:11:43

Travel Duration: 00:01:43

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:20

Slack: 22:17:39

Path info

Path ID: 195175

Truck: Truck auto 148 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 147 - Driver
  • Worker 292 - Worker
  • Worker 293 - Worker

Load: 15.73 m³

Duration: 00:13:41

Travel Duration: 00:02:41

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:18

Slack: 22:15:41

Path info

Path ID: 195176

Truck: Truck auto 170 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 169 - Driver
  • Worker 336 - Worker
  • Worker 337 - Worker

Load: 10.84 m³

Duration: 00:09:33

Travel Duration: 00:01:33

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:40:10

Slack: 22:19:49

Path info

Path ID: 195177

Truck: Truck auto 176 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 175 - Driver
  • Worker 348 - Worker
  • Worker 349 - Worker

Load: 15.72 m³

Duration: 00:12:41

Travel Duration: 00:02:41

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:18

Slack: 22:16:41

Path info

Path ID: 195178

Truck: Truck auto 190 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 189 - Driver
  • Worker 376 - Worker
  • Worker 377 - Worker

Load: 14.57 m³

Duration: 00:10:59

Travel Duration: 00:01:59

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:36

Slack: 22:18:23

Path info

Path ID: 195179

Truck: Truck auto 210 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 209 - Driver
  • Worker 416 - Worker
  • Worker 417 - Worker

Load: 15.99 m³

Duration: 00:13:16

Travel Duration: 00:02:16

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:53

Slack: 22:16:06

Path info

Path ID: 195180

Truck: Truck auto 220 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 219 - Driver
  • Worker 436 - Worker
  • Worker 437 - Worker

Load: 15.79 m³

Duration: 00:11:39

Travel Duration: 00:02:39

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:16

Slack: 22:17:43

Path info

Path ID: 195181

Truck: Truck auto 254 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 253 - Driver
  • Worker 504 - Worker
  • Worker 505 - Worker

Load: 14.55 m³

Duration: 00:10:50

Travel Duration: 00:01:50

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:27

Slack: 22:18:32

Path info

Path ID: 195182

Truck: Truck auto 348 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 347 - Driver
  • Worker 692 - Worker
  • Worker 693 - Worker

Load: 15.77 m³

Duration: 00:12:04

Travel Duration: 00:03:04

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:41

Slack: 22:17:18

Path info

Path ID: 195183

Truck: Truck auto 434 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 433 - Driver
  • Worker 864 - Worker
  • Worker 865 - Worker

Load: 15.8 m³

Duration: 00:15:42

Travel Duration: 00:05:42

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:19

Slack: 22:13:40

Path info

Path ID: 195184

Truck: Truck auto 446 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 445 - Driver
  • Worker 888 - Worker
  • Worker 889 - Worker

Load: 13.76 m³

Duration: 00:08:17

Travel Duration: 00:01:17

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:38:54

Slack: 22:21:05

Path info

Path ID: 195185

Truck: Truck auto 462 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 461 - Driver
  • Worker 920 - Worker
  • Worker 921 - Worker

Load: 14.03 m³

Duration: 00:11:43

Travel Duration: 00:02:43

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:20

Slack: 22:17:39

Path info

Path ID: 195186

Truck: Truck auto 466 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 465 - Driver
  • Worker 928 - Worker
  • Worker 929 - Worker

Load: 15.87 m³

Duration: 00:13:28

Travel Duration: 00:04:28

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:05

Slack: 22:15:54

Path info

Path ID: 195187

Truck: Truck auto 484 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 483 - Driver
  • Worker 964 - Worker
  • Worker 965 - Worker

Load: 15.91 m³

Duration: 00:10:44

Travel Duration: 00:01:44

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:21

Slack: 22:18:38

Path info

Path ID: 195188

Truck: Truck auto 486 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 485 - Driver
  • Worker 968 - Worker
  • Worker 969 - Worker

Load: 15.55 m³

Duration: 00:13:38

Travel Duration: 00:03:38

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:15

Slack: 22:15:44

Path info

Path ID: 195189

Truck: Truck auto 498 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 497 - Driver
  • Worker 992 - Worker
  • Worker 993 - Worker

Load: 14.4 m³

Duration: 00:08:58

Travel Duration: 00:00:58

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:39:35

Slack: 22:20:24

Path info

Path ID: 195190

Truck: Truck auto 500 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 499 - Driver
  • Worker 996 - Worker
  • Worker 997 - Worker

Load: 13.69 m³

Duration: 00:11:10

Travel Duration: 00:02:10

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:47

Slack: 22:18:12

Path info

Path ID: 195191

Truck: Truck auto 620 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 619 - Driver
  • Worker 1236 - Worker
  • Worker 1237 - Worker

Load: 13.04 m³

Duration: 00:10:05

Travel Duration: 00:02:05

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:40:42

Slack: 22:19:17

Path info

Path ID: 195192

Truck: Truck auto 642 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 641 - Driver
  • Worker 1280 - Worker
  • Worker 1281 - Worker

Load: 15.75 m³

Duration: 00:15:12

Travel Duration: 00:04:12

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:49

Slack: 22:14:10

Path info

Path ID: 195193

Truck: Truck auto 660 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 659 - Driver
  • Worker 1316 - Worker
  • Worker 1317 - Worker

Load: 15.95 m³

Duration: 00:12:46

Travel Duration: 00:02:46

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:23

Slack: 22:16:36

Path info

Path ID: 195194

Truck: Truck auto 674 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 673 - Driver
  • Worker 1344 - Worker
  • Worker 1345 - Worker

Load: 15.87 m³

Duration: 00:11:42

Travel Duration: 00:01:42

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:19

Slack: 22:17:40

Path info

Path ID: 195195

Truck: Truck auto 690 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 689 - Driver
  • Worker 1376 - Worker
  • Worker 1377 - Worker

Load: 15.95 m³

Duration: 00:11:50

Travel Duration: 00:01:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:27

Slack: 22:17:32

Path info

Path ID: 195196

Truck: Truck auto 738 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 737 - Driver
  • Worker 1472 - Worker
  • Worker 1473 - Worker

Load: 15.15 m³

Duration: 00:11:04

Travel Duration: 00:02:04

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:41

Slack: 22:18:18

Path info

Path ID: 195197

Truck: Truck auto 742 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 741 - Driver
  • Worker 1480 - Worker
  • Worker 1481 - Worker

Load: 15.87 m³

Duration: 00:12:40

Travel Duration: 00:02:40

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:17

Slack: 22:16:42

Path info

Path ID: 195198

Truck: Truck auto 750 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 749 - Driver
  • Worker 1496 - Worker
  • Worker 1497 - Worker

Load: 15.3 m³

Duration: 00:14:09

Travel Duration: 00:03:09

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:46

Slack: 22:15:13

Path info

Path ID: 195199

Truck: Truck auto 854 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 853 - Driver
  • Worker 1704 - Worker
  • Worker 1705 - Worker

Load: 14.02 m³

Duration: 00:11:37

Travel Duration: 00:02:37

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:14

Slack: 22:17:45

Path info

Path ID: 195200

Truck: Truck auto 22 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 21 - Driver
  • Worker 40 - Worker
  • Worker 41 - Worker

Load: 16.0 m³

Duration: 00:17:33

Travel Duration: 00:06:33

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:10

Slack: 22:11:49

Path info

Path ID: 195201

Truck: Truck auto 24 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 23 - Driver
  • Worker 44 - Worker
  • Worker 45 - Worker

Load: 15.81 m³

Duration: 00:15:33

Travel Duration: 00:05:33

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:10

Slack: 22:13:49

Path info

Path ID: 195202

Truck: Truck auto 48 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 47 - Driver
  • Worker 92 - Worker
  • Worker 93 - Worker

Load: 15.75 m³

Duration: 00:17:47

Travel Duration: 00:07:47

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:24

Slack: 22:11:35

Path info

Path ID: 195203

Truck: Truck auto 78 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 77 - Driver
  • Worker 152 - Worker
  • Worker 153 - Worker

Load: 15.63 m³

Duration: 00:16:19

Travel Duration: 00:05:19

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:56

Slack: 22:13:03

Path info

Path ID: 195204

Truck: Truck auto 108 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 107 - Driver
  • Worker 212 - Worker
  • Worker 213 - Worker

Load: 15.83 m³

Duration: 00:18:01

Travel Duration: 00:08:01

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:38

Slack: 22:11:21

Path info

Path ID: 195205

Truck: Truck auto 140 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 139 - Driver
  • Worker 276 - Worker
  • Worker 277 - Worker

Load: 15.81 m³

Duration: 00:19:20

Travel Duration: 00:07:20

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:57

Slack: 22:10:02

Path info

Path ID: 195206

Truck: Truck auto 182 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 181 - Driver
  • Worker 360 - Worker
  • Worker 361 - Worker

Load: 14.99 m³

Duration: 00:15:41

Travel Duration: 00:06:41

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:18

Slack: 22:13:41

Path info

Path ID: 195207

Truck: Truck auto 254 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 253 - Driver
  • Worker 504 - Worker
  • Worker 505 - Worker

Load: 15.46 m³

Duration: 00:17:14

Travel Duration: 00:06:14

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:51

Slack: 22:12:08

Path info

Path ID: 195208

Truck: Truck auto 272 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 271 - Driver
  • Worker 540 - Worker
  • Worker 541 - Worker

Load: 15.78 m³

Duration: 00:16:07

Travel Duration: 00:07:07

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:44

Slack: 22:13:15

Path info

Path ID: 195209

Truck: Truck auto 284 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 283 - Driver
  • Worker 564 - Worker
  • Worker 565 - Worker

Load: 15.41 m³

Duration: 00:15:59

Travel Duration: 00:05:59

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:36

Slack: 22:13:23

Path info

Path ID: 195210

Truck: Truck auto 354 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 353 - Driver
  • Worker 704 - Worker
  • Worker 705 - Worker

Load: 14.89 m³

Duration: 00:14:16

Travel Duration: 00:05:16

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:53

Slack: 22:15:06

Path info

Path ID: 195211

Truck: Truck auto 418 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 417 - Driver
  • Worker 832 - Worker
  • Worker 833 - Worker

Load: 15.65 m³

Duration: 00:15:38

Travel Duration: 00:06:38

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:15

Slack: 22:13:44

Path info

Path ID: 195212

Truck: Truck auto 504 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 503 - Driver
  • Worker 1004 - Worker
  • Worker 1005 - Worker

Load: 15.73 m³

Duration: 00:14:12

Travel Duration: 00:05:12

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:49

Slack: 22:15:10

Path info

Path ID: 195213

Truck: Truck auto 534 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 533 - Driver
  • Worker 1064 - Worker
  • Worker 1065 - Worker

Load: 15.54 m³

Duration: 00:15:38

Travel Duration: 00:04:38

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:15

Slack: 22:13:44

Path info

Path ID: 195214

Truck: Truck auto 544 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 543 - Driver
  • Worker 1084 - Worker
  • Worker 1085 - Worker

Load: 15.59 m³

Duration: 00:16:09

Travel Duration: 00:06:09

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:46

Slack: 22:13:13

Path info

Path ID: 195215

Truck: Truck auto 556 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 555 - Driver
  • Worker 1108 - Worker
  • Worker 1109 - Worker

Load: 15.93 m³

Duration: 00:18:54

Travel Duration: 00:07:54

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:31

Slack: 22:10:28

Path info

Path ID: 195216

Truck: Truck auto 594 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 593 - Driver
  • Worker 1184 - Worker
  • Worker 1185 - Worker

Load: 13.91 m³

Duration: 00:13:21

Travel Duration: 00:05:21

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:58

Slack: 22:16:01

Path info

Path ID: 195217

Truck: Truck auto 600 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 599 - Driver
  • Worker 1196 - Worker
  • Worker 1197 - Worker

Load: 15.84 m³

Duration: 00:16:41

Travel Duration: 00:07:41

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:18

Slack: 22:12:41

Path info

Path ID: 195218

Truck: Truck auto 692 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 691 - Driver
  • Worker 1380 - Worker
  • Worker 1381 - Worker

Load: 14.85 m³

Duration: 00:15:19

Travel Duration: 00:05:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:56

Slack: 22:14:03

Path info

Path ID: 195219

Truck: Truck auto 748 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 747 - Driver
  • Worker 1492 - Worker
  • Worker 1493 - Worker

Load: 15.33 m³

Duration: 00:16:27

Travel Duration: 00:07:27

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:04

Slack: 22:12:55

Path info

Path ID: 195220

Truck: Truck auto 764 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 763 - Driver
  • Worker 1524 - Worker
  • Worker 1525 - Worker

Load: 15.24 m³

Duration: 00:17:02

Travel Duration: 00:07:02

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:39

Slack: 22:12:20

Path info

Path ID: 195221

Truck: Truck auto 948 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 947 - Driver
  • Worker 1892 - Worker
  • Worker 1893 - Worker

Load: 15.47 m³

Duration: 00:15:09

Travel Duration: 00:05:09

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:46

Slack: 22:14:13

Path info

Path ID: 195222

Truck: Truck auto 35 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 34 - Driver
  • Worker 66 - Worker
  • Worker 67 - Worker

Load: 15.9 m³

Duration: 00:17:19

Travel Duration: 00:07:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:56

Slack: 22:12:03

Path info

Path ID: 195223

Truck: Truck auto 55 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 54 - Driver
  • Worker 106 - Worker
  • Worker 107 - Worker

Load: 15.79 m³

Duration: 00:16:55

Travel Duration: 00:07:55

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:32

Slack: 22:12:27

Path info

Path ID: 195224

Truck: Truck auto 77 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 76 - Driver
  • Worker 150 - Worker
  • Worker 151 - Worker

Load: 15.8 m³

Duration: 00:16:42

Travel Duration: 00:07:42

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:19

Slack: 22:12:40

Path info

Path ID: 195225

Truck: Truck auto 89 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 88 - Driver
  • Worker 174 - Worker
  • Worker 175 - Worker

Load: 16.0 m³

Duration: 00:17:07

Travel Duration: 00:06:07

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:44

Slack: 22:12:15

Path info

Path ID: 195226

Truck: Truck auto 149 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 148 - Driver
  • Worker 294 - Worker
  • Worker 295 - Worker

Load: 15.59 m³

Duration: 00:16:34

Travel Duration: 00:05:34

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:11

Slack: 22:12:48

Path info

Path ID: 195227

Truck: Truck auto 161 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 160 - Driver
  • Worker 318 - Worker
  • Worker 319 - Worker

Load: 15.31 m³

Duration: 00:16:12

Travel Duration: 00:07:12

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:49

Slack: 22:13:10

Path info

Path ID: 195228

Truck: Truck auto 165 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 164 - Driver
  • Worker 326 - Worker
  • Worker 327 - Worker

Load: 15.99 m³

Duration: 00:14:16

Travel Duration: 00:05:16

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:53

Slack: 22:15:06

Path info

Path ID: 195229

Truck: Truck auto 195 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 194 - Driver
  • Worker 386 - Worker
  • Worker 387 - Worker

Load: 15.72 m³

Duration: 00:13:50

Travel Duration: 00:04:50

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:27

Slack: 22:15:32

Path info

Path ID: 195230

Truck: Truck auto 213 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 212 - Driver
  • Worker 422 - Worker
  • Worker 423 - Worker

Load: 15.5 m³

Duration: 00:13:51

Travel Duration: 00:04:51

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:28

Slack: 22:15:31

Path info

Path ID: 195231

Truck: Truck auto 229 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 228 - Driver
  • Worker 454 - Worker
  • Worker 455 - Worker

Load: 15.91 m³

Duration: 00:13:12

Travel Duration: 00:05:12

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:49

Slack: 22:16:10

Path info

Path ID: 195232

Truck: Truck auto 273 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 272 - Driver
  • Worker 542 - Worker
  • Worker 543 - Worker

Load: 15.83 m³

Duration: 00:17:56

Travel Duration: 00:07:56

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:33

Slack: 22:11:26

Path info

Path ID: 195233

Truck: Truck auto 279 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 278 - Driver
  • Worker 554 - Worker
  • Worker 555 - Worker

Load: 15.59 m³

Duration: 00:14:18

Travel Duration: 00:05:18

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:55

Slack: 22:15:04

Path info

Path ID: 195234

Truck: Truck auto 379 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 378 - Driver
  • Worker 754 - Worker
  • Worker 755 - Worker

Load: 15.89 m³

Duration: 00:17:46

Travel Duration: 00:06:46

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:23

Slack: 22:11:36

Path info

Path ID: 195235

Truck: Truck auto 421 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 420 - Driver
  • Worker 838 - Worker
  • Worker 839 - Worker

Load: 15.76 m³

Duration: 00:14:26

Travel Duration: 00:05:26

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:03

Slack: 22:14:56

Path info

Path ID: 195236

Truck: Truck auto 425 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 424 - Driver
  • Worker 846 - Worker
  • Worker 847 - Worker

Load: 15.58 m³

Duration: 00:16:10

Travel Duration: 00:07:10

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:47

Slack: 22:13:12

Path info

Path ID: 195237

Truck: Truck auto 429 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 428 - Driver
  • Worker 854 - Worker
  • Worker 855 - Worker

Load: 15.81 m³

Duration: 00:18:15

Travel Duration: 00:07:15

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:52

Slack: 22:11:07

Path info

Path ID: 195238

Truck: Truck auto 525 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 524 - Driver
  • Worker 1046 - Worker
  • Worker 1047 - Worker

Load: 15.8 m³

Duration: 00:16:31

Travel Duration: 00:06:31

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:08

Slack: 22:12:51

Path info

Path ID: 195239

Truck: Truck auto 571 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 570 - Driver
  • Worker 1138 - Worker
  • Worker 1139 - Worker

Load: 15.61 m³

Duration: 00:16:04

Travel Duration: 00:07:04

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:41

Slack: 22:13:18

Path info

Path ID: 195240

Truck: Truck auto 573 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 572 - Driver
  • Worker 1142 - Worker
  • Worker 1143 - Worker

Load: 15.67 m³

Duration: 00:17:19

Travel Duration: 00:07:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:56

Slack: 22:12:03

Path info

Path ID: 195241

Truck: Truck auto 715 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 714 - Driver
  • Worker 1426 - Worker
  • Worker 1427 - Worker

Load: 16.0 m³

Duration: 00:14:09

Travel Duration: 00:06:09

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:46

Slack: 22:15:13

Path info

Path ID: 195242

Truck: Truck auto 813 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 812 - Driver
  • Worker 1622 - Worker
  • Worker 1623 - Worker

Load: 15.32 m³

Duration: 00:15:37

Travel Duration: 00:05:37

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:14

Slack: 22:13:45

Path info

Path ID: 195243

Truck: Truck auto 855 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 854 - Driver
  • Worker 1706 - Worker
  • Worker 1707 - Worker

Load: 15.56 m³

Duration: 00:14:24

Travel Duration: 00:06:24

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:01

Slack: 22:14:58

Path info

Path ID: 195244

Truck: Truck auto 937 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 936 - Driver
  • Worker 1870 - Worker
  • Worker 1871 - Worker

Load: 15.77 m³

Duration: 00:18:36

Travel Duration: 00:08:36

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:13

Slack: 22:10:46

Path info

Path ID: 195245

Truck: Truck auto 947 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 946 - Driver
  • Worker 1890 - Worker
  • Worker 1891 - Worker

Load: 15.89 m³

Duration: 00:18:25

Travel Duration: 00:06:25

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:02

Slack: 22:10:57

Path info

Path ID: 195246

Truck: Truck auto 2 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 1 - Driver
  • person14 - Worker
  • Worker 1 - Worker

Load: 15.88 m³

Duration: 00:17:21

Travel Duration: 00:08:21

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:58

Slack: 22:12:01

Path info

Path ID: 195247

Truck: Truck auto 6 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 5 - Driver
  • Worker 8 - Worker
  • Worker 9 - Worker

Load: 15.51 m³

Duration: 00:14:29

Travel Duration: 00:06:29

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:06

Slack: 22:14:53

Path info

Path ID: 195248

Truck: Truck auto 28 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 27 - Driver
  • Worker 52 - Worker
  • Worker 53 - Worker

Load: 15.7 m³

Duration: 00:18:31

Travel Duration: 00:08:31

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:08

Slack: 22:10:51

Path info

Path ID: 195249

Truck: Truck auto 36 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 35 - Driver
  • Worker 68 - Worker
  • Worker 69 - Worker

Load: 14.52 m³

Duration: 00:18:04

Travel Duration: 00:09:04

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:41

Slack: 22:11:18

Path info

Path ID: 195250

Truck: Truck auto 110 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 109 - Driver
  • Worker 216 - Worker
  • Worker 217 - Worker

Load: 15.76 m³

Duration: 00:16:15

Travel Duration: 00:07:15

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:52

Slack: 22:13:07

Path info

Path ID: 195251

Truck: Truck auto 130 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 129 - Driver
  • Worker 256 - Worker
  • Worker 257 - Worker

Load: 16.0 m³

Duration: 00:17:52

Travel Duration: 00:07:52

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:29

Slack: 22:11:30

Path info

Path ID: 195252

Truck: Truck auto 170 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 169 - Driver
  • Worker 336 - Worker
  • Worker 337 - Worker

Load: 15.66 m³

Duration: 00:17:58

Travel Duration: 00:08:58

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:35

Slack: 22:11:24

Path info

Path ID: 195253

Truck: Truck auto 306 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 305 - Driver
  • Worker 608 - Worker
  • Worker 609 - Worker

Load: 15.63 m³

Duration: 00:16:35

Travel Duration: 00:05:35

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:12

Slack: 22:12:47

Path info

Path ID: 195254

Truck: Truck auto 358 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 357 - Driver
  • Worker 712 - Worker
  • Worker 713 - Worker

Load: 15.27 m³

Duration: 00:17:24

Travel Duration: 00:07:24

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:01

Slack: 22:11:58

Path info

Path ID: 195255

Truck: Truck auto 382 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 381 - Driver
  • Worker 760 - Worker
  • Worker 761 - Worker

Load: 15.33 m³

Duration: 00:15:52

Travel Duration: 00:05:52

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:29

Slack: 22:13:30

Path info

Path ID: 195256

Truck: Truck auto 412 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 411 - Driver
  • Worker 820 - Worker
  • Worker 821 - Worker

Load: 15.9 m³

Duration: 00:16:19

Travel Duration: 00:07:19

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:56

Slack: 22:13:03

Path info

Path ID: 195257

Truck: Truck auto 432 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 431 - Driver
  • Worker 860 - Worker
  • Worker 861 - Worker

Load: 15.27 m³

Duration: 00:16:44

Travel Duration: 00:06:44

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:21

Slack: 22:12:38

Path info

Path ID: 195258

Truck: Truck auto 434 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 433 - Driver
  • Worker 864 - Worker
  • Worker 865 - Worker

Load: 15.62 m³

Duration: 00:19:49

Travel Duration: 00:08:49

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:26

Slack: 22:09:33

Path info

Path ID: 195259

Truck: Truck auto 442 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 441 - Driver
  • Worker 880 - Worker
  • Worker 881 - Worker

Load: 15.52 m³

Duration: 00:17:59

Travel Duration: 00:07:59

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:36

Slack: 22:11:23

Path info

Path ID: 195260

Truck: Truck auto 450 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 449 - Driver
  • Worker 896 - Worker
  • Worker 897 - Worker

Load: 15.34 m³

Duration: 00:15:35

Travel Duration: 00:05:35

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:12

Slack: 22:13:47

Path info

Path ID: 195261

Truck: Truck auto 462 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 461 - Driver
  • Worker 920 - Worker
  • Worker 921 - Worker

Load: 15.69 m³

Duration: 00:17:37

Travel Duration: 00:07:37

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:14

Slack: 22:11:45

Path info

Path ID: 195262

Truck: Truck auto 490 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 489 - Driver
  • Worker 976 - Worker
  • Worker 977 - Worker

Load: 14.21 m³

Duration: 00:15:31

Travel Duration: 00:06:31

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:08

Slack: 22:13:51

Path info

Path ID: 195263

Truck: Truck auto 528 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 527 - Driver
  • Worker 1052 - Worker
  • Worker 1053 - Worker

Load: 15.92 m³

Duration: 00:15:59

Travel Duration: 00:05:59

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:36

Slack: 22:13:23

Path info

Path ID: 195264

Truck: Truck auto 596 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 595 - Driver
  • Worker 1188 - Worker
  • Worker 1189 - Worker

Load: 14.54 m³

Duration: 00:18:13

Travel Duration: 00:08:13

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:50

Slack: 22:11:09

Path info

Path ID: 195265

Truck: Truck auto 608 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 607 - Driver
  • Worker 1212 - Worker
  • Worker 1213 - Worker

Load: 15.93 m³

Duration: 00:19:11

Travel Duration: 00:08:11

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:48

Slack: 22:10:11

Path info

Path ID: 195266

Truck: Truck auto 776 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 775 - Driver
  • Worker 1548 - Worker
  • Worker 1549 - Worker

Load: 15.48 m³

Duration: 00:15:38

Travel Duration: 00:07:38

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:15

Slack: 22:13:44

Path info

Path ID: 195267

Truck: Truck auto 850 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 849 - Driver
  • Worker 1696 - Worker
  • Worker 1697 - Worker

Load: 15.75 m³

Duration: 00:19:17

Travel Duration: 00:08:17

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:54

Slack: 22:10:05

Path info

Path ID: 195268

Truck: Truck auto 876 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 875 - Driver
  • Worker 1748 - Worker
  • Worker 1749 - Worker

Load: 15.39 m³

Duration: 00:16:05

Travel Duration: 00:06:05

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:42

Slack: 22:13:17

Path info

Path ID: 195269

Truck: Truck auto 21 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 20 - Driver
  • Worker 38 - Worker
  • Worker 39 - Worker

Load: 15.97 m³

Duration: 00:16:32

Travel Duration: 00:07:32

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:09

Slack: 22:12:50

Path info

Path ID: 195270

Truck: Truck auto 65 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 64 - Driver
  • Worker 126 - Worker
  • Worker 127 - Worker

Load: 16.0 m³

Duration: 00:15:24

Travel Duration: 00:05:24

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:01

Slack: 22:13:58

Path info

Path ID: 195271

Truck: Truck auto 117 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 116 - Driver
  • Worker 230 - Worker
  • Worker 231 - Worker

Load: 15.97 m³

Duration: 00:17:56

Travel Duration: 00:06:56

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:33

Slack: 22:11:26

Path info

Path ID: 195272

Truck: Truck auto 131 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 130 - Driver
  • Worker 258 - Worker
  • Worker 259 - Worker

Load: 15.92 m³

Duration: 00:18:59

Travel Duration: 00:07:59

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:36

Slack: 22:10:23

Path info

Path ID: 195273

Truck: Truck auto 149 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 148 - Driver
  • Worker 294 - Worker
  • Worker 295 - Worker

Load: 15.66 m³

Duration: 00:14:39

Travel Duration: 00:05:39

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:16

Slack: 22:14:43

Path info

Path ID: 195274

Truck: Truck auto 163 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 162 - Driver
  • Worker 322 - Worker
  • Worker 323 - Worker

Load: 15.63 m³

Duration: 00:18:48

Travel Duration: 00:08:48

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:25

Slack: 22:10:34

Path info

Path ID: 195275

Truck: Truck auto 169 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 168 - Driver
  • Worker 334 - Worker
  • Worker 335 - Worker

Load: 15.82 m³

Duration: 00:18:32

Travel Duration: 00:08:32

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:09

Slack: 22:10:50

Path info

Path ID: 195276

Truck: Truck auto 173 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 172 - Driver
  • Worker 342 - Worker
  • Worker 343 - Worker

Load: 15.69 m³

Duration: 00:14:44

Travel Duration: 00:05:44

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:21

Slack: 22:14:38

Path info

Path ID: 195277

Truck: Truck auto 175 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 174 - Driver
  • Worker 346 - Worker
  • Worker 347 - Worker

Load: 14.99 m³

Duration: 00:18:40

Travel Duration: 00:08:40

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:17

Slack: 22:10:42

Path info

Path ID: 195278

Truck: Truck auto 281 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 280 - Driver
  • Worker 558 - Worker
  • Worker 559 - Worker

Load: 15.07 m³

Duration: 00:17:55

Travel Duration: 00:07:55

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:32

Slack: 22:11:27

Path info

Path ID: 195279

Truck: Truck auto 401 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 400 - Driver
  • Worker 798 - Worker
  • Worker 799 - Worker

Load: 15.72 m³

Duration: 00:19:30

Travel Duration: 00:08:30

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:07

Slack: 22:09:52

Path info

Path ID: 195280

Truck: Truck auto 411 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 410 - Driver
  • Worker 818 - Worker
  • Worker 819 - Worker

Load: 15.74 m³

Duration: 00:19:43

Travel Duration: 00:08:43

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:20

Slack: 22:09:39

Path info

Path ID: 195281

Truck: Truck auto 489 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 488 - Driver
  • Worker 974 - Worker
  • Worker 975 - Worker

Load: 15.43 m³

Duration: 00:16:31

Travel Duration: 00:06:31

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:08

Slack: 22:12:51

Path info

Path ID: 195282

Truck: Truck auto 505 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 504 - Driver
  • Worker 1006 - Worker
  • Worker 1007 - Worker

Load: 15.47 m³

Duration: 00:18:20

Travel Duration: 00:08:20

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:57

Slack: 22:11:02

Path info

Path ID: 195283

Truck: Truck auto 535 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 534 - Driver
  • Worker 1066 - Worker
  • Worker 1067 - Worker

Load: 15.07 m³

Duration: 00:14:24

Travel Duration: 00:06:24

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:01

Slack: 22:14:58

Path info

Path ID: 195284

Truck: Truck auto 565 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 564 - Driver
  • Worker 1126 - Worker
  • Worker 1127 - Worker

Load: 15.92 m³

Duration: 00:18:06

Travel Duration: 00:08:06

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:43

Slack: 22:11:16

Path info

Path ID: 195285

Truck: Truck auto 609 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 608 - Driver
  • Worker 1214 - Worker
  • Worker 1215 - Worker

Load: 15.96 m³

Duration: 00:17:02

Travel Duration: 00:06:02

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:39

Slack: 22:12:20

Path info

Path ID: 195286

Truck: Truck auto 679 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 678 - Driver
  • Worker 1354 - Worker
  • Worker 1355 - Worker

Load: 15.9 m³

Duration: 00:16:47

Travel Duration: 00:06:47

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:24

Slack: 22:12:35

Path info

Path ID: 195287

Truck: Truck auto 753 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 752 - Driver
  • Worker 1502 - Worker
  • Worker 1503 - Worker

Load: 15.55 m³

Duration: 00:18:52

Travel Duration: 00:07:52

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:29

Slack: 22:10:30

Path info

Path ID: 195288

Truck: Truck auto 809 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 808 - Driver
  • Worker 1614 - Worker
  • Worker 1615 - Worker

Load: 15.79 m³

Duration: 00:17:26

Travel Duration: 00:08:26

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:03

Slack: 22:11:56

Path info

Path ID: 195289

Truck: Truck auto 821 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 820 - Driver
  • Worker 1638 - Worker
  • Worker 1639 - Worker

Load: 15.79 m³

Duration: 00:17:46

Travel Duration: 00:07:46

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:23

Slack: 22:11:36

Path info

Path ID: 195290

Truck: Truck auto 971 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 970 - Driver
  • Worker 1938 - Worker
  • Worker 1939 - Worker

Load: 15.51 m³

Duration: 00:19:33

Travel Duration: 00:08:33

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:10

Slack: 22:09:49

Path info

Path ID: 195291

Truck: Truck auto 4 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 3 - Driver
  • Worker 4 - Worker
  • Worker 5 - Worker

Load: 15.96 m³

Duration: 00:18:47

Travel Duration: 00:07:47

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:24

Slack: 22:10:35

Path info

Path ID: 195292

Truck: Truck auto 24 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 23 - Driver
  • Worker 44 - Worker
  • Worker 45 - Worker

Load: 15.97 m³

Duration: 00:18:47

Travel Duration: 00:06:47

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:24

Slack: 22:10:35

Path info

Path ID: 195293

Truck: Truck auto 94 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 93 - Driver
  • Worker 184 - Worker
  • Worker 185 - Worker

Load: 15.83 m³

Duration: 00:17:52

Travel Duration: 00:07:52

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:29

Slack: 22:11:30

Path info

Path ID: 195294

Truck: Truck auto 122 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 121 - Driver
  • Worker 240 - Worker
  • Worker 241 - Worker

Load: 14.37 m³

Duration: 00:13:53

Travel Duration: 00:04:53

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:30

Slack: 22:15:29

Path info

Path ID: 195295

Truck: Truck auto 144 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 143 - Driver
  • Worker 284 - Worker
  • Worker 285 - Worker

Load: 15.46 m³

Duration: 00:17:16

Travel Duration: 00:07:16

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:53

Slack: 22:12:06

Path info

Path ID: 195296

Truck: Truck auto 174 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 173 - Driver
  • Worker 344 - Worker
  • Worker 345 - Worker

Load: 14.66 m³

Duration: 00:15:27

Travel Duration: 00:05:27

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:04

Slack: 22:13:55

Path info

Path ID: 195297

Truck: Truck auto 220 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 219 - Driver
  • Worker 436 - Worker
  • Worker 437 - Worker

Load: 15.98 m³

Duration: 00:19:43

Travel Duration: 00:06:43

Wait Duration: 00:00:00

Service Duration: 00:13:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:20

Slack: 22:09:39

Path info

Path ID: 195298

Truck: Truck auto 236 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 235 - Driver
  • Worker 468 - Worker
  • Worker 469 - Worker

Load: 15.91 m³

Duration: 00:16:35

Travel Duration: 00:07:35

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:12

Slack: 22:12:47

Path info

Path ID: 195299

Truck: Truck auto 242 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 241 - Driver
  • Worker 480 - Worker
  • Worker 481 - Worker

Load: 15.97 m³

Duration: 00:17:14

Travel Duration: 00:07:14

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:51

Slack: 22:12:08

Path info

Path ID: 195300

Truck: Truck auto 300 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 299 - Driver
  • Worker 596 - Worker
  • Worker 597 - Worker

Load: 15.9 m³

Duration: 00:17:14

Travel Duration: 00:07:14

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:51

Slack: 22:12:08

Path info

Path ID: 195301

Truck: Truck auto 312 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 311 - Driver
  • Worker 620 - Worker
  • Worker 621 - Worker

Load: 14.5 m³

Duration: 00:16:37

Travel Duration: 00:07:37

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:14

Slack: 22:12:45

Path info

Path ID: 195302

Truck: Truck auto 320 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 319 - Driver
  • Worker 636 - Worker
  • Worker 637 - Worker

Load: 15.71 m³

Duration: 00:20:49

Travel Duration: 00:07:49

Wait Duration: 00:00:00

Service Duration: 00:13:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:51:26

Slack: 22:08:33

Path info

Path ID: 195303

Truck: Truck auto 328 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 327 - Driver
  • Worker 652 - Worker
  • Worker 653 - Worker

Load: 15.86 m³

Duration: 00:21:05

Travel Duration: 00:08:05

Wait Duration: 00:00:00

Service Duration: 00:13:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:51:42

Slack: 22:08:17

Path info

Path ID: 195304

Truck: Truck auto 346 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 345 - Driver
  • Worker 688 - Worker
  • Worker 689 - Worker

Load: 14.53 m³

Duration: 00:13:24

Travel Duration: 00:05:24

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:01

Slack: 22:15:58

Path info

Path ID: 195305

Truck: Truck auto 358 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 357 - Driver
  • Worker 712 - Worker
  • Worker 713 - Worker

Load: 15.87 m³

Duration: 00:15:25

Travel Duration: 00:05:25

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:02

Slack: 22:13:57

Path info

Path ID: 195306

Truck: Truck auto 364 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 363 - Driver
  • Worker 724 - Worker
  • Worker 725 - Worker

Load: 16.0 m³

Duration: 00:14:54

Travel Duration: 00:06:54

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:31

Slack: 22:14:28

Path info

Path ID: 195307

Truck: Truck auto 374 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 373 - Driver
  • Worker 744 - Worker
  • Worker 745 - Worker

Load: 15.35 m³

Duration: 00:14:12

Travel Duration: 00:06:12

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:49

Slack: 22:15:10

Path info

Path ID: 195308

Truck: Truck auto 492 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 491 - Driver
  • Worker 980 - Worker
  • Worker 981 - Worker

Load: 8.73 m³

Duration: 00:12:50

Travel Duration: 00:06:50

Wait Duration: 00:00:00

Service Duration: 00:06:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:27

Slack: 22:16:32

Path info

Path ID: 195309

Truck: Truck auto 570 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 569 - Driver
  • Worker 1136 - Worker
  • Worker 1137 - Worker

Load: 15.67 m³

Duration: 00:17:10

Travel Duration: 00:06:10

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:47

Slack: 22:12:12

Path info

Path ID: 195310

Truck: Truck auto 664 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 663 - Driver
  • Worker 1324 - Worker
  • Worker 1325 - Worker

Load: 15.59 m³

Duration: 00:17:13

Travel Duration: 00:07:13

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:50

Slack: 22:12:09

Path info

Path ID: 195311

Truck: Truck auto 692 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 691 - Driver
  • Worker 1380 - Worker
  • Worker 1381 - Worker

Load: 15.78 m³

Duration: 00:17:20

Travel Duration: 00:06:20

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:57

Slack: 22:12:02

Path info

Path ID: 195312

Truck: Truck auto 712 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 711 - Driver
  • Worker 1420 - Worker
  • Worker 1421 - Worker

Load: 15.92 m³

Duration: 00:16:14

Travel Duration: 00:07:14

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:51

Slack: 22:13:08

Path info

Path ID: 195313

Truck: Truck auto 718 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 717 - Driver
  • Worker 1432 - Worker
  • Worker 1433 - Worker

Load: 15.84 m³

Duration: 00:15:47

Travel Duration: 00:05:47

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:24

Slack: 22:13:35

Path info

Path ID: 195314

Truck: Truck 4 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • person9 - Driver
  • person8 - Worker
  • person11 - Worker

Load: 15.53 m³

Duration: 00:10:35

Travel Duration: 00:01:35

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:12

Slack: 22:18:47

Path info

Path ID: 195315

Truck: Truck auto 23 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 22 - Driver
  • Worker 42 - Worker
  • Worker 43 - Worker

Load: 15.8 m³

Duration: 00:11:30

Travel Duration: 00:02:30

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:07

Slack: 22:17:52

Path info

Path ID: 195316

Truck: Truck auto 33 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 32 - Driver
  • Worker 62 - Worker
  • Worker 63 - Worker

Load: 14.04 m³

Duration: 00:09:59

Travel Duration: 00:00:59

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:40:36

Slack: 22:19:23

Path info

Path ID: 195317

Truck: Truck auto 55 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 54 - Driver
  • Worker 106 - Worker
  • Worker 107 - Worker

Load: 15.08 m³

Duration: 00:13:23

Travel Duration: 00:03:23

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:00

Slack: 22:15:59

Path info

Path ID: 195318

Truck: Truck auto 63 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 62 - Driver
  • Worker 122 - Worker
  • Worker 123 - Worker

Load: 15.31 m³

Duration: 00:14:35

Travel Duration: 00:04:35

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:12

Slack: 22:14:47

Path info

Path ID: 195319

Truck: Truck auto 105 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 104 - Driver
  • Worker 206 - Worker
  • Worker 207 - Worker

Load: 15.8 m³

Duration: 00:13:01

Travel Duration: 00:03:01

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:38

Slack: 22:16:21

Path info

Path ID: 195320

Truck: Truck auto 111 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 110 - Driver
  • Worker 218 - Worker
  • Worker 219 - Worker

Load: 15.84 m³

Duration: 00:12:30

Travel Duration: 00:02:30

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:07

Slack: 22:16:52

Path info

Path ID: 195321

Truck: Truck auto 131 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 130 - Driver
  • Worker 258 - Worker
  • Worker 259 - Worker

Load: 15.02 m³

Duration: 00:10:04

Travel Duration: 00:03:04

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:40:41

Slack: 22:19:18

Path info

Path ID: 195322

Truck: Truck auto 139 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 138 - Driver
  • Worker 274 - Worker
  • Worker 275 - Worker

Load: 15.52 m³

Duration: 00:11:25

Travel Duration: 00:01:25

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:02

Slack: 22:17:57

Path info

Path ID: 195323

Truck: Truck auto 145 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 144 - Driver
  • Worker 286 - Worker
  • Worker 287 - Worker

Load: 14.42 m³

Duration: 00:10:25

Travel Duration: 00:01:25

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:02

Slack: 22:18:57

Path info

Path ID: 195324

Truck: Truck auto 161 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 160 - Driver
  • Worker 318 - Worker
  • Worker 319 - Worker

Load: 14.34 m³

Duration: 00:11:19

Travel Duration: 00:01:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:56

Slack: 22:18:03

Path info

Path ID: 195325

Truck: Truck auto 197 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 196 - Driver
  • Worker 390 - Worker
  • Worker 391 - Worker

Load: 16.0 m³

Duration: 00:11:58

Travel Duration: 00:01:58

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:35

Slack: 22:17:24

Path info

Path ID: 195326

Truck: Truck auto 231 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 230 - Driver
  • Worker 458 - Worker
  • Worker 459 - Worker

Load: 15.48 m³

Duration: 00:13:54

Travel Duration: 00:02:54

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:31

Slack: 22:15:28

Path info

Path ID: 195327

Truck: Truck auto 289 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 288 - Driver
  • Worker 574 - Worker
  • Worker 575 - Worker

Load: 14.95 m³

Duration: 00:11:14

Travel Duration: 00:02:14

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:51

Slack: 22:18:08

Path info

Path ID: 195328

Truck: Truck auto 295 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 294 - Driver
  • Worker 586 - Worker
  • Worker 587 - Worker

Load: 15.77 m³

Duration: 00:11:43

Travel Duration: 00:02:43

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:20

Slack: 22:17:39

Path info

Path ID: 195329

Truck: Truck auto 385 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 384 - Driver
  • Worker 766 - Worker
  • Worker 767 - Worker

Load: 15.34 m³

Duration: 00:10:47

Travel Duration: 00:01:47

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:24

Slack: 22:18:35

Path info

Path ID: 195330

Truck: Truck auto 519 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 518 - Driver
  • Worker 1034 - Worker
  • Worker 1035 - Worker

Load: 15.6 m³

Duration: 00:12:41

Travel Duration: 00:02:41

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:18

Slack: 22:16:41

Path info

Path ID: 195331

Truck: Truck auto 545 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 544 - Driver
  • Worker 1086 - Worker
  • Worker 1087 - Worker

Load: 16.0 m³

Duration: 00:12:56

Travel Duration: 00:02:56

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:33

Slack: 22:16:26

Path info

Path ID: 195332

Truck: Truck auto 551 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 550 - Driver
  • Worker 1098 - Worker
  • Worker 1099 - Worker

Load: 14.93 m³

Duration: 00:11:20

Travel Duration: 00:02:20

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:57

Slack: 22:18:02

Path info

Path ID: 195333

Truck: Truck auto 577 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 576 - Driver
  • Worker 1150 - Worker
  • Worker 1151 - Worker

Load: 14.18 m³

Duration: 00:11:53

Travel Duration: 00:01:53

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:42:30

Slack: 22:17:29

Path info

Path ID: 195334

Truck: Truck auto 625 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 624 - Driver
  • Worker 1246 - Worker
  • Worker 1247 - Worker

Load: 15.58 m³

Duration: 00:13:30

Travel Duration: 00:03:30

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:07

Slack: 22:15:52

Path info

Path ID: 195335

Truck: Truck auto 675 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 674 - Driver
  • Worker 1346 - Worker
  • Worker 1347 - Worker

Load: 15.34 m³

Duration: 00:15:39

Travel Duration: 00:03:39

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:16

Slack: 22:13:43

Path info

Path ID: 195336

Truck: Truck auto 797 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 796 - Driver
  • Worker 1590 - Worker
  • Worker 1591 - Worker

Load: 14.72 m³

Duration: 00:15:04

Travel Duration: 00:04:04

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:41

Slack: 22:14:18

Path info

Path ID: 195337

Truck: Truck auto 827 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 826 - Driver
  • Worker 1650 - Worker
  • Worker 1651 - Worker

Load: 15.84 m³

Duration: 00:13:04

Travel Duration: 00:03:04

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:41

Slack: 22:16:18

Path info

Path ID: 195338

Truck: Truck auto 835 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 834 - Driver
  • Worker 1666 - Worker
  • Worker 1667 - Worker

Load: 15.27 m³

Duration: 00:12:50

Travel Duration: 00:02:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:27

Slack: 22:16:32

Path info

Path ID: 195339

Truck: Truck auto 847 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 846 - Driver
  • Worker 1690 - Worker
  • Worker 1691 - Worker

Load: 15.19 m³

Duration: 00:11:03

Travel Duration: 00:02:03

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:40

Slack: 22:18:19

Path info

Path ID: 195340

Truck: Truck auto 867 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 866 - Driver
  • Worker 1730 - Worker
  • Worker 1731 - Worker

Load: 16.0 m³

Duration: 00:15:46

Travel Duration: 00:05:46

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:23

Slack: 22:13:36

Path info

Path ID: 195341

Truck: Truck auto 929 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 928 - Driver
  • Worker 1854 - Worker
  • Worker 1855 - Worker

Load: 15.97 m³

Duration: 00:11:17

Travel Duration: 00:02:17

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:41:54

Slack: 22:18:05

Path info

Path ID: 195342

Truck: Truck auto 947 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 946 - Driver
  • Worker 1890 - Worker
  • Worker 1891 - Worker

Load: 13.07 m³

Duration: 00:10:21

Travel Duration: 00:01:21

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:40:58

Slack: 22:19:01

Path info

Path ID: 195343

Truck: Truck auto 67 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 66 - Driver
  • Worker 130 - Worker
  • Worker 131 - Worker

Load: 15.71 m³

Duration: 00:19:41

Travel Duration: 00:07:41

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:18

Slack: 22:09:41

Path info

Path ID: 195344

Truck: Truck auto 83 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 82 - Driver
  • Worker 162 - Worker
  • Worker 163 - Worker

Load: 14.85 m³

Duration: 00:17:27

Travel Duration: 00:07:27

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:04

Slack: 22:11:55

Path info

Path ID: 195345

Truck: Truck auto 121 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 120 - Driver
  • Worker 238 - Worker
  • Worker 239 - Worker

Load: 15.82 m³

Duration: 00:16:13

Travel Duration: 00:06:13

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:50

Slack: 22:13:09

Path info

Path ID: 195346

Truck: Truck auto 135 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 134 - Driver
  • Worker 266 - Worker
  • Worker 267 - Worker

Load: 15.44 m³

Duration: 00:17:28

Travel Duration: 00:06:28

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:05

Slack: 22:11:54

Path info

Path ID: 195347

Truck: Truck auto 151 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 150 - Driver
  • Worker 298 - Worker
  • Worker 299 - Worker

Load: 16.0 m³

Duration: 00:18:09

Travel Duration: 00:07:09

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:46

Slack: 22:11:13

Path info

Path ID: 195348

Truck: Truck auto 159 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 158 - Driver
  • Worker 314 - Worker
  • Worker 315 - Worker

Load: 15.87 m³

Duration: 00:16:11

Travel Duration: 00:07:11

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:48

Slack: 22:13:11

Path info

Path ID: 195349

Truck: Truck auto 175 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 174 - Driver
  • Worker 346 - Worker
  • Worker 347 - Worker

Load: 15.88 m³

Duration: 00:16:39

Travel Duration: 00:07:39

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:16

Slack: 22:12:43

Path info

Path ID: 195350

Truck: Truck auto 195 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 194 - Driver
  • Worker 386 - Worker
  • Worker 387 - Worker

Load: 15.69 m³

Duration: 00:16:40

Travel Duration: 00:05:40

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:17

Slack: 22:12:42

Path info

Path ID: 195351

Truck: Truck auto 203 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 202 - Driver
  • Worker 402 - Worker
  • Worker 403 - Worker

Load: 15.8 m³

Duration: 00:15:30

Travel Duration: 00:05:30

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:07

Slack: 22:13:52

Path info

Path ID: 195352

Truck: Truck auto 269 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 268 - Driver
  • Worker 534 - Worker
  • Worker 535 - Worker

Load: 12.36 m³

Duration: 00:13:09

Travel Duration: 00:06:09

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:46

Slack: 22:16:13

Path info

Path ID: 195353

Truck: Truck auto 327 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 326 - Driver
  • Worker 650 - Worker
  • Worker 651 - Worker

Load: 14.77 m³

Duration: 00:14:44

Travel Duration: 00:05:44

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:21

Slack: 22:14:38

Path info

Path ID: 195354

Truck: Truck auto 345 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 344 - Driver
  • Worker 686 - Worker
  • Worker 687 - Worker

Load: 15.88 m³

Duration: 00:17:26

Travel Duration: 00:06:26

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:03

Slack: 22:11:56

Path info

Path ID: 195355

Truck: Truck auto 349 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 348 - Driver
  • Worker 694 - Worker
  • Worker 695 - Worker

Load: 14.38 m³

Duration: 00:14:22

Travel Duration: 00:05:22

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:59

Slack: 22:15:00

Path info

Path ID: 195356

Truck: Truck auto 407 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 406 - Driver
  • Worker 810 - Worker
  • Worker 811 - Worker

Load: 15.97 m³

Duration: 00:17:51

Travel Duration: 00:07:51

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:28

Slack: 22:11:31

Path info

Path ID: 195357

Truck: Truck auto 439 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 438 - Driver
  • Worker 874 - Worker
  • Worker 875 - Worker

Load: 15.9 m³

Duration: 00:14:57

Travel Duration: 00:04:57

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:34

Slack: 22:14:25

Path info

Path ID: 195358

Truck: Truck auto 441 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 440 - Driver
  • Worker 878 - Worker
  • Worker 879 - Worker

Load: 15.91 m³

Duration: 00:17:24

Travel Duration: 00:07:24

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:01

Slack: 22:11:58

Path info

Path ID: 195359

Truck: Truck auto 523 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 522 - Driver
  • Worker 1042 - Worker
  • Worker 1043 - Worker

Load: 14.26 m³

Duration: 00:15:31

Travel Duration: 00:06:31

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:08

Slack: 22:13:51

Path info

Path ID: 195360

Truck: Truck auto 551 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 550 - Driver
  • Worker 1098 - Worker
  • Worker 1099 - Worker

Load: 15.78 m³

Duration: 00:17:19

Travel Duration: 00:07:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:56

Slack: 22:12:03

Path info

Path ID: 195361

Truck: Truck auto 587 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 586 - Driver
  • Worker 1170 - Worker
  • Worker 1171 - Worker

Load: 15.75 m³

Duration: 00:19:44

Travel Duration: 00:07:44

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:21

Slack: 22:09:38

Path info

Path ID: 195362

Truck: Truck auto 615 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 614 - Driver
  • Worker 1226 - Worker
  • Worker 1227 - Worker

Load: 15.88 m³

Duration: 00:14:36

Travel Duration: 00:06:36

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:13

Slack: 22:14:46

Path info

Path ID: 195363

Truck: Truck auto 629 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 628 - Driver
  • Worker 1254 - Worker
  • Worker 1255 - Worker

Load: 15.97 m³

Duration: 00:18:15

Travel Duration: 00:07:15

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:52

Slack: 22:11:07

Path info

Path ID: 195364

Truck: Truck auto 817 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 816 - Driver
  • Worker 1630 - Worker
  • Worker 1631 - Worker

Load: 15.98 m³

Duration: 00:15:44

Travel Duration: 00:06:44

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:21

Slack: 22:13:38

Path info

Path ID: 195365

Truck: Truck auto 969 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 968 - Driver
  • Worker 1934 - Worker
  • Worker 1935 - Worker

Load: 15.95 m³

Duration: 00:17:10

Travel Duration: 00:07:10

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:47

Slack: 22:12:12

Path info

Path ID: 195366

Truck: Truck auto 35 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 34 - Driver
  • Worker 66 - Worker
  • Worker 67 - Worker

Load: 13.78 m³

Duration: 00:16:23

Travel Duration: 00:06:23

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:00

Slack: 22:12:59

Path info

Path ID: 195367

Truck: Truck auto 97 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 96 - Driver
  • Worker 190 - Worker
  • Worker 191 - Worker

Load: 14.53 m³

Duration: 00:16:35

Travel Duration: 00:06:35

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:12

Slack: 22:12:47

Path info

Path ID: 195368

Truck: Truck auto 129 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 128 - Driver
  • Worker 254 - Worker
  • Worker 255 - Worker

Load: 14.97 m³

Duration: 00:17:28

Travel Duration: 00:07:28

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:05

Slack: 22:11:54

Path info

Path ID: 195369

Truck: Truck auto 175 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 174 - Driver
  • Worker 346 - Worker
  • Worker 347 - Worker

Load: 15.94 m³

Duration: 00:16:53

Travel Duration: 00:06:53

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:30

Slack: 22:12:29

Path info

Path ID: 195370

Truck: Truck auto 219 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 218 - Driver
  • Worker 434 - Worker
  • Worker 435 - Worker

Load: 14.71 m³

Duration: 00:13:29

Travel Duration: 00:05:29

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:06

Slack: 22:15:53

Path info

Path ID: 195371

Truck: Truck auto 255 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 254 - Driver
  • Worker 506 - Worker
  • Worker 507 - Worker

Load: 15.82 m³

Duration: 00:16:49

Travel Duration: 00:06:49

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:26

Slack: 22:12:33

Path info

Path ID: 195372

Truck: Truck auto 277 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 276 - Driver
  • Worker 550 - Worker
  • Worker 551 - Worker

Load: 14.59 m³

Duration: 00:14:33

Travel Duration: 00:05:33

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:10

Slack: 22:14:49

Path info

Path ID: 195373

Truck: Truck auto 295 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 294 - Driver
  • Worker 586 - Worker
  • Worker 587 - Worker

Load: 15.82 m³

Duration: 00:17:23

Travel Duration: 00:07:23

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:00

Slack: 22:11:59

Path info

Path ID: 195374

Truck: Truck auto 363 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 362 - Driver
  • Worker 722 - Worker
  • Worker 723 - Worker

Load: 15.73 m³

Duration: 00:18:13

Travel Duration: 00:07:13

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:50

Slack: 22:11:09

Path info

Path ID: 195375

Truck: Truck auto 399 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 398 - Driver
  • Worker 794 - Worker
  • Worker 795 - Worker

Load: 15.69 m³

Duration: 00:16:47

Travel Duration: 00:06:47

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:24

Slack: 22:12:35

Path info

Path ID: 195376

Truck: Truck auto 467 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 466 - Driver
  • Worker 930 - Worker
  • Worker 931 - Worker

Load: 15.8 m³

Duration: 00:15:49

Travel Duration: 00:06:49

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:26

Slack: 22:13:33

Path info

Path ID: 195377

Truck: Truck auto 473 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 472 - Driver
  • Worker 942 - Worker
  • Worker 943 - Worker

Load: 15.69 m³

Duration: 00:17:29

Travel Duration: 00:08:29

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:06

Slack: 22:11:53

Path info

Path ID: 195378

Truck: Truck auto 517 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 516 - Driver
  • Worker 1030 - Worker
  • Worker 1031 - Worker

Load: 15.93 m³

Duration: 00:18:00

Travel Duration: 00:08:00

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:37

Slack: 22:11:22

Path info

Path ID: 195379

Truck: Truck auto 539 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 538 - Driver
  • Worker 1074 - Worker
  • Worker 1075 - Worker

Load: 15.82 m³

Duration: 00:17:54

Travel Duration: 00:07:54

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:31

Slack: 22:11:28

Path info

Path ID: 195380

Truck: Truck auto 559 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 558 - Driver
  • Worker 1114 - Worker
  • Worker 1115 - Worker

Load: 15.86 m³

Duration: 00:18:20

Travel Duration: 00:09:20

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:57

Slack: 22:11:02

Path info

Path ID: 195381

Truck: Truck auto 577 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 576 - Driver
  • Worker 1150 - Worker
  • Worker 1151 - Worker

Load: 15.8 m³

Duration: 00:17:11

Travel Duration: 00:07:11

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:48

Slack: 22:12:11

Path info

Path ID: 195382

Truck: Truck auto 583 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 582 - Driver
  • Worker 1162 - Worker
  • Worker 1163 - Worker

Load: 15.52 m³

Duration: 00:17:47

Travel Duration: 00:07:47

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:24

Slack: 22:11:35

Path info

Path ID: 195383

Truck: Truck auto 603 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 602 - Driver
  • Worker 1202 - Worker
  • Worker 1203 - Worker

Load: 15.54 m³

Duration: 00:15:49

Travel Duration: 00:06:49

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:26

Slack: 22:13:33

Path info

Path ID: 195384

Truck: Truck auto 655 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 654 - Driver
  • Worker 1306 - Worker
  • Worker 1307 - Worker

Load: 15.64 m³

Duration: 00:19:03

Travel Duration: 00:08:03

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:40

Slack: 22:10:19

Path info

Path ID: 195385

Truck: Truck auto 667 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 666 - Driver
  • Worker 1330 - Worker
  • Worker 1331 - Worker

Load: 15.87 m³

Duration: 00:17:28

Travel Duration: 00:07:28

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:05

Slack: 22:11:54

Path info

Path ID: 195386

Truck: Truck auto 687 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 686 - Driver
  • Worker 1370 - Worker
  • Worker 1371 - Worker

Load: 14.92 m³

Duration: 00:16:24

Travel Duration: 00:06:24

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:01

Slack: 22:12:58

Path info

Path ID: 195387

Truck: Truck auto 729 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 728 - Driver
  • Worker 1454 - Worker
  • Worker 1455 - Worker

Load: 15.96 m³

Duration: 00:18:07

Travel Duration: 00:08:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:44

Slack: 22:11:15

Path info

Path ID: 195388

Truck: Truck auto 881 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 880 - Driver
  • Worker 1758 - Worker
  • Worker 1759 - Worker

Load: 15.83 m³

Duration: 00:17:00

Travel Duration: 00:07:00

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:37

Slack: 22:12:22

Path info

Path ID: 195389

Truck: Truck auto 887 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 886 - Driver
  • Worker 1770 - Worker
  • Worker 1771 - Worker

Load: 14.81 m³

Duration: 00:18:13

Travel Duration: 00:07:13

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:50

Slack: 22:11:09

Path info

Path ID: 195390

Truck: Truck auto 889 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 888 - Driver
  • Worker 1774 - Worker
  • Worker 1775 - Worker

Load: 15.91 m³

Duration: 00:15:58

Travel Duration: 00:05:58

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:35

Slack: 22:13:24

Path info

Path ID: 195391

Truck: Truck auto 85 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 84 - Driver
  • Worker 166 - Worker
  • Worker 167 - Worker

Load: 15.83 m³

Duration: 00:15:57

Travel Duration: 00:06:57

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:34

Slack: 22:13:25

Path info

Path ID: 195392

Truck: Truck auto 123 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 122 - Driver
  • Worker 242 - Worker
  • Worker 243 - Worker

Load: 15.71 m³

Duration: 00:16:34

Travel Duration: 00:06:34

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:11

Slack: 22:12:48

Path info

Path ID: 195393

Truck: Truck auto 195 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 194 - Driver
  • Worker 386 - Worker
  • Worker 387 - Worker

Load: 15.82 m³

Duration: 00:20:32

Travel Duration: 00:09:32

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:51:09

Slack: 22:08:50

Path info

Path ID: 195394

Truck: Truck auto 253 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 252 - Driver
  • Worker 502 - Worker
  • Worker 503 - Worker

Load: 15.9 m³

Duration: 00:14:18

Travel Duration: 00:06:18

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:55

Slack: 22:15:04

Path info

Path ID: 195395

Truck: Truck auto 303 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 302 - Driver
  • Worker 602 - Worker
  • Worker 603 - Worker

Load: 15.62 m³

Duration: 00:20:05

Travel Duration: 00:09:05

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:42

Slack: 22:09:17

Path info

Path ID: 195396

Truck: Truck auto 337 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 336 - Driver
  • Worker 670 - Worker
  • Worker 671 - Worker

Load: 15.95 m³

Duration: 00:14:09

Travel Duration: 00:06:09

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:46

Slack: 22:15:13

Path info

Path ID: 195397

Truck: Truck auto 375 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 374 - Driver
  • Worker 746 - Worker
  • Worker 747 - Worker

Load: 15.55 m³

Duration: 00:19:30

Travel Duration: 00:08:30

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:07

Slack: 22:09:52

Path info

Path ID: 195398

Truck: Truck auto 377 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 376 - Driver
  • Worker 750 - Worker
  • Worker 751 - Worker

Load: 15.47 m³

Duration: 00:16:28

Travel Duration: 00:06:28

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:05

Slack: 22:12:54

Path info

Path ID: 195399

Truck: Truck auto 463 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 462 - Driver
  • Worker 922 - Worker
  • Worker 923 - Worker

Load: 15.66 m³

Duration: 00:17:54

Travel Duration: 00:07:54

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:31

Slack: 22:11:28

Path info

Path ID: 195400

Truck: Truck auto 753 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 752 - Driver
  • Worker 1502 - Worker
  • Worker 1503 - Worker

Load: 15.19 m³

Duration: 00:18:52

Travel Duration: 00:08:52

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:29

Slack: 22:10:30

Path info

Path ID: 195401

Truck: Truck auto 769 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 768 - Driver
  • Worker 1534 - Worker
  • Worker 1535 - Worker

Load: 15.97 m³

Duration: 00:19:21

Travel Duration: 00:09:21

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:58

Slack: 22:10:01

Path info

Path ID: 195402

Truck: Truck auto 779 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 778 - Driver
  • Worker 1554 - Worker
  • Worker 1555 - Worker

Load: 15.46 m³

Duration: 00:15:05

Travel Duration: 00:07:05

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:42

Slack: 22:14:17

Path info

Path ID: 195403

Truck: Truck auto 949 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 948 - Driver
  • Worker 1894 - Worker
  • Worker 1895 - Worker

Load: 15.13 m³

Duration: 00:16:21

Travel Duration: 00:06:21

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:58

Slack: 22:13:01

Path info

Path ID: 195404

Truck: Truck auto 957 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 956 - Driver
  • Worker 1910 - Worker
  • Worker 1911 - Worker

Load: 15.81 m³

Duration: 00:18:35

Travel Duration: 00:08:35

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:12

Slack: 22:10:47

Path info

Path ID: 195405

Truck: Truck auto 985 - 16.0m³ - GENERAL

Date: 2025-12-06

Personnel:

  • Driver 984 - Driver
  • Worker 1966 - Worker
  • Worker 1967 - Worker

Load: 15.87 m³

Duration: 00:19:58

Travel Duration: 00:08:58

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:35

Slack: 22:09:24

Path info

Path ID: 195406

Truck: Truck auto 18 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 17 - Driver
  • Worker 32 - Worker
  • Worker 33 - Worker

Load: 15.95 m³

Duration: 00:16:58

Travel Duration: 00:06:58

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:35

Slack: 22:12:24

Path info

Path ID: 195407

Truck: Truck auto 22 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 21 - Driver
  • Worker 40 - Worker
  • Worker 41 - Worker

Load: 15.8 m³

Duration: 00:18:01

Travel Duration: 00:08:01

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:38

Slack: 22:11:21

Path info

Path ID: 195408

Truck: Truck auto 24 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 23 - Driver
  • Worker 44 - Worker
  • Worker 45 - Worker

Load: 15.92 m³

Duration: 00:18:17

Travel Duration: 00:07:17

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:54

Slack: 22:11:05

Path info

Path ID: 195409

Truck: Truck auto 94 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 93 - Driver
  • Worker 184 - Worker
  • Worker 185 - Worker

Load: 15.98 m³

Duration: 00:21:26

Travel Duration: 00:08:26

Wait Duration: 00:00:00

Service Duration: 00:13:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:52:03

Slack: 22:07:56

Path info

Path ID: 195410

Truck: Truck auto 122 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 121 - Driver
  • Worker 240 - Worker
  • Worker 241 - Worker

Load: 15.95 m³

Duration: 00:15:08

Travel Duration: 00:07:08

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:45

Slack: 22:14:14

Path info

Path ID: 195411

Truck: Truck auto 126 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 125 - Driver
  • Worker 248 - Worker
  • Worker 249 - Worker

Load: 15.89 m³

Duration: 00:15:33

Travel Duration: 00:06:33

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:10

Slack: 22:13:49

Path info

Path ID: 195412

Truck: Truck auto 190 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 189 - Driver
  • Worker 376 - Worker
  • Worker 377 - Worker

Load: 15.67 m³

Duration: 00:16:17

Travel Duration: 00:07:17

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:54

Slack: 22:13:05

Path info

Path ID: 195413

Truck: Truck auto 214 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 213 - Driver
  • Worker 424 - Worker
  • Worker 425 - Worker

Load: 15.77 m³

Duration: 00:17:58

Travel Duration: 00:07:58

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:35

Slack: 22:11:24

Path info

Path ID: 195414

Truck: Truck auto 224 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 223 - Driver
  • Worker 444 - Worker
  • Worker 445 - Worker

Load: 15.83 m³

Duration: 00:18:52

Travel Duration: 00:08:52

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:29

Slack: 22:10:30

Path info

Path ID: 195415

Truck: Truck auto 238 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 237 - Driver
  • Worker 472 - Worker
  • Worker 473 - Worker

Load: 15.53 m³

Duration: 00:16:06

Travel Duration: 00:07:06

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:43

Slack: 22:13:16

Path info

Path ID: 195416

Truck: Truck auto 264 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 263 - Driver
  • Worker 524 - Worker
  • Worker 525 - Worker

Load: 15.77 m³

Duration: 00:15:50

Travel Duration: 00:06:50

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:27

Slack: 22:13:32

Path info

Path ID: 195417

Truck: Truck auto 270 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 269 - Driver
  • Worker 536 - Worker
  • Worker 537 - Worker

Load: 15.97 m³

Duration: 00:17:14

Travel Duration: 00:07:14

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:51

Slack: 22:12:08

Path info

Path ID: 195418

Truck: Truck auto 340 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 339 - Driver
  • Worker 676 - Worker
  • Worker 677 - Worker

Load: 15.96 m³

Duration: 00:19:28

Travel Duration: 00:08:28

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:05

Slack: 22:09:54

Path info

Path ID: 195419

Truck: Truck auto 396 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 395 - Driver
  • Worker 788 - Worker
  • Worker 789 - Worker

Load: 15.95 m³

Duration: 00:16:56

Travel Duration: 00:06:56

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:33

Slack: 22:12:26

Path info

Path ID: 195420

Truck: Truck auto 462 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 461 - Driver
  • Worker 920 - Worker
  • Worker 921 - Worker

Load: 15.97 m³

Duration: 00:16:37

Travel Duration: 00:06:37

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:14

Slack: 22:12:45

Path info

Path ID: 195421

Truck: Truck auto 546 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 545 - Driver
  • Worker 1088 - Worker
  • Worker 1089 - Worker

Load: 15.37 m³

Duration: 00:17:34

Travel Duration: 00:07:34

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:11

Slack: 22:11:48

Path info

Path ID: 195422

Truck: Truck auto 580 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 579 - Driver
  • Worker 1156 - Worker
  • Worker 1157 - Worker

Load: 15.86 m³

Duration: 00:18:50

Travel Duration: 00:06:50

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:27

Slack: 22:10:32

Path info

Path ID: 195423

Truck: Truck auto 618 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 617 - Driver
  • Worker 1232 - Worker
  • Worker 1233 - Worker

Load: 15.7 m³

Duration: 00:15:27

Travel Duration: 00:06:27

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:04

Slack: 22:13:55

Path info

Path ID: 195424

Truck: Truck auto 622 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 621 - Driver
  • Worker 1240 - Worker
  • Worker 1241 - Worker

Load: 15.9 m³

Duration: 00:16:42

Travel Duration: 00:05:42

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:19

Slack: 22:12:40

Path info

Path ID: 195425

Truck: Truck auto 640 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 639 - Driver
  • Worker 1276 - Worker
  • Worker 1277 - Worker

Load: 15.83 m³

Duration: 00:16:50

Travel Duration: 00:06:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:27

Slack: 22:12:32

Path info

Path ID: 195426

Truck: Truck auto 674 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 673 - Driver
  • Worker 1344 - Worker
  • Worker 1345 - Worker

Load: 15.87 m³

Duration: 00:16:31

Travel Duration: 00:07:31

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:08

Slack: 22:12:51

Path info

Path ID: 195427

Truck: Truck auto 758 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 757 - Driver
  • Worker 1512 - Worker
  • Worker 1513 - Worker

Load: 16.0 m³

Duration: 00:15:02

Travel Duration: 00:06:02

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:39

Slack: 22:14:20

Path info

Path ID: 195428

Truck: Truck auto 860 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 859 - Driver
  • Worker 1716 - Worker
  • Worker 1717 - Worker

Load: 15.28 m³

Duration: 00:18:59

Travel Duration: 00:07:59

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:36

Slack: 22:10:23

Path info

Path ID: 195429

Truck: Truck auto 874 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 873 - Driver
  • Worker 1744 - Worker
  • Worker 1745 - Worker

Load: 15.36 m³

Duration: 00:16:00

Travel Duration: 00:07:00

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:37

Slack: 22:13:22

Path info

Path ID: 195430

Truck: Truck auto 960 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 959 - Driver
  • Worker 1916 - Worker
  • Worker 1917 - Worker

Load: 15.96 m³

Duration: 00:17:25

Travel Duration: 00:07:25

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:48:02

Slack: 22:11:57

Path info

Path ID: 195431

Truck: Truck auto 18 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 17 - Driver
  • Worker 32 - Worker
  • Worker 33 - Worker

Load: 15.75 m³

Duration: 00:21:14

Travel Duration: 00:09:14

Wait Duration: 00:00:00

Service Duration: 00:12:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:51:51

Slack: 22:08:08

Path info

Path ID: 195432

Truck: Truck auto 64 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 63 - Driver
  • Worker 124 - Worker
  • Worker 125 - Worker

Load: 14.55 m³

Duration: 00:12:56

Travel Duration: 00:05:56

Wait Duration: 00:00:00

Service Duration: 00:07:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:43:33

Slack: 22:16:26

Path info

Path ID: 195433

Truck: Truck auto 134 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 133 - Driver
  • Worker 264 - Worker
  • Worker 265 - Worker

Load: 15.3 m³

Duration: 00:20:21

Travel Duration: 00:09:21

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:58

Slack: 22:09:01

Path info

Path ID: 195434

Truck: Truck auto 216 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 215 - Driver
  • Worker 428 - Worker
  • Worker 429 - Worker

Load: 15.83 m³

Duration: 00:19:17

Travel Duration: 00:09:17

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:54

Slack: 22:10:05

Path info

Path ID: 195435

Truck: Truck auto 264 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 263 - Driver
  • Worker 524 - Worker
  • Worker 525 - Worker

Load: 15.13 m³

Duration: 00:16:50

Travel Duration: 00:06:50

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:27

Slack: 22:12:32

Path info

Path ID: 195436

Truck: Truck auto 354 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 353 - Driver
  • Worker 704 - Worker
  • Worker 705 - Worker

Load: 15.13 m³

Duration: 00:15:06

Travel Duration: 00:06:06

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:45:43

Slack: 22:14:16

Path info

Path ID: 195437

Truck: Truck auto 404 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 403 - Driver
  • Worker 804 - Worker
  • Worker 805 - Worker

Load: 14.1 m³

Duration: 00:16:07

Travel Duration: 00:06:07

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:46:44

Slack: 22:13:15

Path info

Path ID: 195438

Truck: Truck auto 426 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 425 - Driver
  • Worker 848 - Worker
  • Worker 849 - Worker

Load: 14.05 m³

Duration: 00:16:51

Travel Duration: 00:07:51

Wait Duration: 00:00:00

Service Duration: 00:09:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:28

Slack: 22:12:31

Path info

Path ID: 195439

Truck: Truck auto 612 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 611 - Driver
  • Worker 1220 - Worker
  • Worker 1221 - Worker

Load: 14.73 m³

Duration: 00:18:41

Travel Duration: 00:08:41

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:18

Slack: 22:10:41

Path info

Path ID: 195440

Truck: Truck auto 670 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 669 - Driver
  • Worker 1336 - Worker
  • Worker 1337 - Worker

Load: 15.47 m³

Duration: 00:19:19

Travel Duration: 00:09:19

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:56

Slack: 22:10:03

Path info

Path ID: 195441

Truck: Truck auto 732 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 731 - Driver
  • Worker 1460 - Worker
  • Worker 1461 - Worker

Load: 15.58 m³

Duration: 00:19:08

Travel Duration: 00:08:08

Wait Duration: 00:00:00

Service Duration: 00:11:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:49:45

Slack: 22:10:14

Path info

Path ID: 195442

Truck: Truck auto 756 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 755 - Driver
  • Worker 1508 - Worker
  • Worker 1509 - Worker

Load: 15.93 m³

Duration: 00:13:53

Travel Duration: 00:05:53

Wait Duration: 00:00:00

Service Duration: 00:08:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:44:30

Slack: 22:15:29

Path info

Path ID: 195443

Truck: Truck auto 776 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 775 - Driver
  • Worker 1548 - Worker
  • Worker 1549 - Worker

Load: 14.28 m³

Duration: 00:16:26

Travel Duration: 00:06:26

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:03

Slack: 22:12:56

Path info

Path ID: 195444

Truck: Truck auto 954 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 953 - Driver
  • Worker 1904 - Worker
  • Worker 1905 - Worker

Load: 14.88 m³

Duration: 00:19:53

Travel Duration: 00:09:53

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:50:30

Slack: 22:09:29

Path info

Path ID: 195445

Truck: Truck auto 1000 - 16.0m³ - GENERAL_RECYCLING

Date: 2025-12-06

Personnel:

  • Driver 999 - Driver
  • Worker 1996 - Worker
  • Worker 1997 - Worker

Load: 15.29 m³

Duration: 00:17:13

Travel Duration: 00:07:13

Wait Duration: 00:00:00

Service Duration: 00:10:00

Release Time: 00:00:00

Start Time: 01:30:37

End Time: 01:47:50

Slack: 22:12:09